Expansion of Existing Fertilizer Plant for Manufacturing of Nano-Fertilizer, Paradeep Unit at IFFCO Paradeep Unit, Khatta no. 29 (Plot no. 401(p)) & 44(Plot no. 400(p)), Surinder Jakhar Nagar, Village- Musadia, PO-Paradeep, Tehsil-Kujang, District-Jagatsinghpur, Odisha-754142 by M/s Indian Farmers Fertiliser Cooperative Limited (IFFCO) is an approved industrial project in Musadia, Paradip, Jagatsinghapur, Odisha. The site covers 2,127.6 acres.
Who is building it?
The applicant is Indian Farmers Fertiliser Cooperative Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 29 Aug 2023), as of 27 Nov 2026.
Where is it?
In Musadia, Paradip, Jagatsinghapur, Odisha.
How big is it?
It has a stated cost of ₹7,050.9 crore and a site of 2,127.6 acres.
When was it filed?
The application was filed on 29 Aug 2023.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 29 Aug 2023 |
| Application filed | 29 Aug 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Industry |
| Applicant | Indian Farmers Fertiliser Cooperative Limited |
| Land area | 2,127.6 acres (861 ha) |
| Project cost | ₹7,050.9 crore |
| Village / locality | Musadia |
| Taluk / tehsil | Paradip |
| District | Jagatsinghapur |
| State | Odisha |
| Location from | Site area on record |
| Our reference | WID-OR-00053 |
In context
6 applications in Jagatsinghapur since January 2022 are in the same category (Industry): 4 approved, 2 filed or under review, and 0 withdrawn, lapsed or rejected.
14 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Musadia, Paradip, Jagatsinghapur, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Amalgamation of EC of Captive Power Plant (2x30 MW) with the EC of Pellet… — returned to applicant, 1.8 km away
- Amalgamation of Environment Clearances (ECs) of Pellet Plant # 1&2 (12 MTPA)… — under environmental review, 1.8 km away
- Ro-Pax Jetty at Musadia — coastal clearance granted, 2 km away
- Expansion of Captive Riverine Jetty Facility with Material Handling Capacity… — lapsed, 2.3 km away
- Captive Riverine Jetty of Material Handling Capacity of 4.5 MTPA on River… — environmental approval granted, 2.4 km away
- Captive Riverine Jetty of Material Handling Capacity of 4.5 MTPA on River… — returned to applicant, 2.4 km away
- Laying of 34 inch Dia underground Slurry pipeline by M/s ArcelorMittal Nippon… — lapsed, 2.5 km away
- Integrated Steel Plant in the villages of Udayabata, Nuagarh, and… — more information requested, 3 km away
All 17 Indian Farmers Fertiliser projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.