Quick answers
What is Ro-Pax Jetty at Musadia?
Ro-Pax Jetty at Musadia is an approved port and coastal project in Udayabata, Paradeep Lock, Jagatsinghapur, Odisha. The site covers 0.8 acres.
Who is building it?
The applicant is Superintending Engineer, Ports & Inland Water Transport, Civil Division.
Has it been approved?
Yes. Its status is “Coastal clearance granted” (since 25 Jun 2026), as of 27 Nov 2026.
Where is it?
In Udayabata, Paradeep Lock, Jagatsinghapur, Odisha.
How big is it?
It has a stated cost of ₹42.9 crore and a site of 0.8 acres.
When was it filed?
The application was filed on 23 Mar 2026.
Project details
| Official title | Development of Ro-Pax Jetty at Musadia in Kujanga Block of Jagatsinghpur District |
|---|---|
| Status | Coastal clearance granted |
| Status since | 25 Jun 2026 |
| Application filed | 23 Mar 2026 |
| Approval sought | Coastal review |
| Application type | New project |
| Sector | Ports & coast |
| Applicant | Superintending Engineer, Ports & Inland Water Transport, Civil Division |
| Land area | 3,200 m² |
| Project cost | ₹42.9 crore |
| Village / locality | Udayabata |
| Taluk / tehsil | Paradeep Lock |
| District | Jagatsinghapur |
| State | Odisha |
| Location from | Site boundary on record |
| Our reference | WID-OR-04766 |
In context
12 applications in Jagatsinghapur since January 2022 are in the same category (Ports & coast): 4 approved, 5 filed or under review, and 3 withdrawn, lapsed or rejected. At 0.8 acres, this one is smaller than 100% of them.
12 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Udayabata, Paradeep Lock, Jagatsinghapur, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion of Captive Riverine Jetty Facility with Material Handling Capacity… — lapsed, 450 m away
- Laying of 34 inch Dia underground Slurry pipeline by M/s ArcelorMittal Nippon… — lapsed, 600 m away
- Captive Riverine Jetty of Material Handling Capacity of 4.5 MTPA on River… — environmental approval granted, 700 m away
- Captive Riverine Jetty of Material Handling Capacity of 4.5 MTPA on River… — returned to applicant, 700 m away
- Amalgamation of Environment Clearances (ECs) of Pellet Plant # 1&2 (12 MTPA)… — under environmental review, 1.4 km away
- Amalgamation of EC of Captive Power Plant (2x30 MW) with the EC of Pellet… — returned to applicant, 1.6 km away
- Expansion of Existing Fertilizer Plant for Manufacturing of Nano-Fertilizer,… — environmental approval granted, 2 km away
- Integrated Steel Plant in the villages of Udayabata, Nuagarh, and… — more information requested, 2.1 km away
All 3 Superintending Engineer, Ports projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.