Quick answers
What is this project?
Proposed Expansion of an Industrial Building With a Total Built-Up Area Increased From 24,730.3 Sqm to to 26,760.3sqm, Over a Total Plot Area of 61593 Sqm is a proposed building project in Bhurk>Munda, Badmal, Jharsuguda, Odisha. The site covers 15.2 acres.
Who is building it?
The applicant is Sterlite Electric Limited.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Bhurk>Munda, Badmal, Jharsuguda, Odisha.
How big is it?
It has a stated cost of ₹182 crore and a site of 15.2 acres.
When was it filed?
The application was filed on 11 Jun 2026.
Project details
| Status | More information requested |
|---|---|
| Status since | 5 Nov 2026 |
| Application filed | 11 Jun 2026 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Buildings & townships |
| Applicant | Sterlite Electric Limited |
| Land area | 15.2 acres (6.2 ha) |
| Project cost | ₹182 crore |
| Village / locality | Bhurk>Munda |
| Taluk / tehsil | Badmal |
| District | Jharsuguda |
| State | Odisha |
| Location from | Site boundary on record |
| Our reference | WID-OR-03247 |
In context
11 applications in Jharsuguda since January 2022 are in the same category (Buildings & townships): 1 approved, 9 filed or under review, and 1 withdrawn, lapsed or rejected. At 15.2 acres, this one is smaller than 100% of them.
23 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bhurk>Munda, Badmal, Jharsuguda, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Close to Talabira II & III: A 23-Million-Tonne-a-Year Coal Mine for Jharsuguda and Sambalpur, Odisha (11.2 km away).
Other projects nearby
- Proposed "WORLD CLASS ALUMINIUM PARK OF VEDANTA" (Special Purpose Vehicle of… — environmental approval granted, 800 m away
- Expansion of Aluminium Smelter Production Capacity from 16 LTPA to 18 LTPA,… — lapsed, 1.1 km away
- For Electrical Installation & Switch Yard for 2400 MW of Thermal Power Plant… — lapsed, 2.6 km away
- Transfer of the Environmental Clearance and its subsequent amendments/transfer… — environmental approval granted, 3.3 km away
- Transfer of Environmental Clearance granted for Aluminium Smelter of capacity… — under environmental review, 3.3 km away
- Proposed Capacity Enhancement of Aluminium Smelter From 18.0 Ltpa to 18.5 Ltpa… — initial checks, 3.3 km away
- Expansion of Aluminium Smelter Production Capacity from 16 LTPA to 18 LTPA,… — lapsed, 3.3 km away
- Proposed Capacity Enhancement of Aluminium Smelter From 18.5 Ltpa to 20.0 Ltpa… — initial checks, 3.3 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.