What is this project?
For Electrical Installation & Switch Yard for 2400 MW of Thermal Power Plant of M/s Vedanta Limited is a lapsed industrial project in Banjari, Badmal, Jharsuguda, Odisha. The site covers 11 acres.
Who is building it?
The applicant is Vedanta Limited.
Has it been approved?
No. The application was lapsed on 4 Dec 2024, so it is no longer under consideration.
Where is it?
In Banjari, Badmal, Jharsuguda, Odisha.
How big is it?
It has a stated cost of ₹18.2 crore; a site of 11 acres and 11 acres (4.4 ha) of forest land.
When was it filed?
The application was filed on 6 Oct 2024.
Project details
| Status | Lapsed |
|---|---|
| Status since | 4 Dec 2024 |
| Application filed | 6 Oct 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Industry |
| Applicant | Vedanta Limited |
| Land area | 11 acres (4.4 ha) |
| Forest land | 11 acres (4.4 ha) |
| Project cost | ₹18.2 crore |
| Village / locality | Banjari |
| Taluk / tehsil | Badmal |
| District | Jharsuguda |
| State | Odisha |
| Location from | Site boundary on record |
| Our reference | WID-OR-04288 |
In context
38 applications in Jharsuguda since January 2022 are in the same category (Industry): 23 approved, 6 filed or under review, and 9 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 11 acres, this one is smaller than 65% of them.
13 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Banjari, Badmal, Jharsuguda, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Close to Talabira II & III: A 23-Million-Tonne-a-Year Coal Mine for Jharsuguda and Sambalpur, Odisha (9.7 km away).
Other projects nearby
- Extension of Existing Township (Built-up Area from 3,16,464.3 sqm to… — not approved, 1.6 km away
- Proposed Expansion of an Industrial Building With a Total Built-Up Area… — more information requested, 2.6 km away
- Expansion of Aluminium Smelter Production Capacity from 16 LTPA to 18 LTPA,… — lapsed, 2.7 km away
- Proposed "WORLD CLASS ALUMINIUM PARK OF VEDANTA" (Special Purpose Vehicle of… — environmental approval granted, 3 km away
- Transfer of EC of Sripura Sand Bed-B over an area 12.00 Acres or 4.86 Ha — environmental approval granted, 3.6 km away
- Sripura Sand Bed-B — not approved, 3.7 km away
- Expansion of existing 60,000 TPA of Sponge Iron from DRI Kiln to Proposed… — lapsed, 4.3 km away
- Sripura -C Sand Quarrry, over 6.09 ha. or 15.01 acres — cleared for impact study, 4.3 km away
More from Vedanta Limited in Jharsuguda
- Proposed Capacity Enhancement of Aluminium Smelter From 18.5 Ltpa to 20.0 Ltpa… — initial checks
- Extension of Existing Township (Built-up Area from 3,16,464.3 sqm to… — not approved
- Proposed Capacity Enhancement of Aluminium Smelter From 18.0 Ltpa to 18.5 Ltpa… — initial checks
- Expansion of Aluminium Smelter Production Capacity from 16 LTPA to 18 LTPA,… — lapsed
- Expansion of Aluminium Smelter Production Capacity from 16 LTPA to 18 LTPA,… — lapsed
- Proposed "WORLD CLASS ALUMINIUM PARK OF VEDANTA" (Special Purpose Vehicle of… — environmental approval granted
7 Vedanta Limited(Division Cairn projects in Jharsuguda
All 76 Vedanta Limited(Division Cairn projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.