Project details
| Official title | Proposed Green Hydrogen plant of 1500 Nm3/Hr capacity without changing other plant facilities within the existing Stainless Steel Plant premises granted in EC by M/s Jindal Stainless Limited at Village – Danagadi, Tehsil - Danagadi, District – Jajpur, Odisha |
|---|---|
| Status | Initial checks |
| Status since | 5 Mar 2026 |
| Application filed | 5 Mar 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Jindal Stainless Limited |
| Use | Industrial |
| Land area | 2,832.7 acres (1,146.3 ha) |
| Project cost | ₹11,041.8 crore |
| Village / locality | Gadapur |
| Taluk / tehsil | Kalinganagar |
| District | Jajapur |
| State | Odisha |
| Location from | Site boundary on record |
| Our reference | WID-OR-03761 |
In context
13 applications in Jajapur since January 2022 are in the same category (Buildings & townships): 4 approved, 8 filed or under review, and 1 withdrawn, lapsed or rejected. At 2,832.7 acres, this one is larger than 92% of them.
40 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Gadapur, Kalinganagar, Jajapur, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Close to Tata Steel Plans a 10-Million-Tonne Expansion at Kalinganagar, Odisha (3.5 km away).
Other projects nearby
- Expansion of Crude Steel Production from 2.2 MTPA to 4.5 MTPA and Cold Rolling… — returned to applicant, 50 m away
- Partial Transfer of 3x600 TPD + 1x450 TPD Lime/Dolo Calcination Plant, 200 TPD… — lapsed, 50 m away
- Transfer of Environmental Clearance (name change) from M/s JSL Ferrous Limited… — environmental approval granted, 700 m away
- Proposed Change in Product Mix From 1.60 Mtpa Cement /Ggbs to 1.60 Mtpa… — initial checks, 800 m away
- CAPACITY EXPANSION OF COKE PRODUCTION FROM 0.78 MTPA to 0.85 MTPA BY… — returned to applicant, 1.1 km away
- New Stamp charge By-product Recovery Coke Oven Battery (COBP#3) and subsequent… — initial checks, 1.1 km away
- Proposed for Capacity Enhancement of Coke Production From 0.78 Mtpa to 0.85… — initial checks, 1.1 km away
- Proposed Greenfield Coal Tar Distillation Unit of Capacity 2,00,000 TPA and… — environmental approval granted, 1.5 km away
More from Jindal Stainless Limited in Jajapur
- Mining project by Kaliapani Chromite Mines(89 ha) of M/s. Jindal Stainless Ltd. — under environmental review
- Kaliapani Chromite Mine (89 ha) of M/s Jindal Stainless Limited — environmental approval granted
- Expansion of Crude Steel Production from 2.2 MTPA to 4.5 MTPA and Cold Rolling… — returned to applicant
4 Jindal Stainless projects in Jajapur
All 12 Jindal Stainless projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.