| Official title | Proposed for Capacity Enhancement of Coke Production From 0.78 Mtpa to 0.85 Mtpa by Installation of 8 Additional Ovens in the Existing Stamp Charge By-Product Recovery Coke Oven Battery (Cobp#2) Along With By-Product Production Enhancement Without Changing Other Plant Facilities Within the Existing Plant Premises. at Village: Danagadi, District: Jajpur, Odisha by M/S Jindal Coke Limited |
|---|---|
| Status | Initial checks |
| Status since | 5 Mar 2025 |
| Application filed | 5 Mar 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Jindal Coke Limited |
| Use | Industrial |
| Land area | 72.5 acres (29.3 ha) |
| Plot area | 2,93,200 m² (31,55,975 sq ft) |
| Project cost | ₹729 crore |
| Village / locality | Khurunti |
| Taluk / tehsil | Kalinganagar |
| District | Jajapur |
| State | Odisha |
| Location from | Site boundary on record |
| Our reference | WID-OR-02262 |
In context
13 applications in Jajapur since January 2022 are in the same category (Buildings & townships): 4 approved, 8 filed or under review, and 1 withdrawn, lapsed or rejected. At 72.5 acres, this one is smaller than 54% of them.
46 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Khurunti, Kalinganagar, Jajapur, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Close to Tata Steel Plans a 10-Million-Tonne Expansion at Kalinganagar, Odisha (3.7 km away).
Other projects nearby
- New Stamp charge By-product Recovery Coke Oven Battery (COBP#3) and subsequent… — initial checks, 0 m away
- CAPACITY EXPANSION OF COKE PRODUCTION FROM 0.78 MTPA to 0.85 MTPA BY… — returned to applicant, 0 m away
- Proposed Green Hydrogen plant of 1500 Nm3/Hr capacity without changing other… — initial checks, 1.1 km away
- Expansion of Crude Steel Production from 2.2 MTPA to 4.5 MTPA and Cold Rolling… — returned to applicant, 1.2 km away
- Partial Transfer of 3x600 TPD + 1x450 TPD Lime/Dolo Calcination Plant, 200 TPD… — lapsed, 1.2 km away
- Proposed Change in Product Mix From 1.60 Mtpa Cement /Ggbs to 1.60 Mtpa… — initial checks, 1.6 km away
- Expansion with Modification of Residential Township Project of M/s Tata Steel… — environmental approval granted, 1.7 km away
- Expansion with Modification of Residential Township Project of M/s Tata Steel… — cleared for impact study, 1.7 km away
More from Jindal Coke Limited in Jajapur
- New Stamp charge By-product Recovery Coke Oven Battery (COBP#3) and subsequent… — initial checks
- CAPACITY EXPANSION OF COKE PRODUCTION FROM 0.78 MTPA to 0.85 MTPA BY… — returned to applicant
All 3 Jindal Coke projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.