Project details
| Status | Returned to applicant |
|---|---|
| Status since | 6 Aug 2024 |
| Application filed | 4 Jul 2024 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Industry |
| Applicant | Jindal Coke Limited |
| Land area | 72.5 acres (29.3 ha) |
| Project cost | ₹739 crore |
| Village / locality | Khurunti |
| Taluk / tehsil | Kalinganagar |
| District | Jajapur |
| State | Odisha |
| Location from | Site boundary on record |
| Our reference | WID-OR-00550 |
In context
56 applications in Jajapur since January 2022 are in the same category (Industry): 27 approved, 15 filed or under review, and 14 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 72.5 acres, this one is smaller than 57% of them.
46 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Khurunti, Kalinganagar, Jajapur, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Close to Tata Steel Plans a 10-Million-Tonne Expansion at Kalinganagar, Odisha (3.7 km away).
Other projects nearby
- New Stamp charge By-product Recovery Coke Oven Battery (COBP#3) and subsequent… — initial checks, 0 m away
- Proposed for Capacity Enhancement of Coke Production From 0.78 Mtpa to 0.85… — initial checks, 0 m away
- Proposed Green Hydrogen plant of 1500 Nm3/Hr capacity without changing other… — initial checks, 1.1 km away
- Expansion of Crude Steel Production from 2.2 MTPA to 4.5 MTPA and Cold Rolling… — returned to applicant, 1.2 km away
- Partial Transfer of 3x600 TPD + 1x450 TPD Lime/Dolo Calcination Plant, 200 TPD… — lapsed, 1.2 km away
- Proposed Change in Product Mix From 1.60 Mtpa Cement /Ggbs to 1.60 Mtpa… — initial checks, 1.6 km away
- Expansion with Modification of Residential Township Project of M/s Tata Steel… — environmental approval granted, 1.7 km away
- Expansion with Modification of Residential Township Project of M/s Tata Steel… — cleared for impact study, 1.7 km away
More from Jindal Coke Limited in Jajapur
- New Stamp charge By-product Recovery Coke Oven Battery (COBP#3) and subsequent… — initial checks
- Proposed for Capacity Enhancement of Coke Production From 0.78 Mtpa to 0.85… — initial checks
All 3 Jindal Coke projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.