Quick answers
What is this project?
Exploration work in Nuagaon Iron Ore Block of M/s JSW Steel Ltd is a lapsed industrial project in Katesahi, Rugudi, Kendujhar, Odisha. The site covers 1,933.6 acres.
Who is building it?
The applicant is Jsw Steel LTD.
Has it been approved?
No. The application was lapsed on 29 Feb 2024, so it is no longer under consideration.
Where is it?
In Katesahi, Rugudi, Kendujhar, Odisha.
How big is it?
It has a stated cost of ₹6.9 crore; a site of 1,933.6 acres and 8.6 acres (3.5 ha) of forest land.
When was it filed?
The application was filed on 22 Nov 2023.
Project details
| Status | Lapsed |
|---|---|
| Status since | 29 Feb 2024 |
| Application filed | 22 Nov 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Industry |
| Applicant | Jsw Steel LTD |
| Land area | 1,933.6 acres (782.5 ha) |
| Forest land | 8.6 acres (3.5 ha) |
| Project cost | ₹6.9 crore |
| Village / locality | Katesahi |
| Taluk / tehsil | Rugudi |
| District | Kendujhar |
| State | Odisha |
| Location from | Site boundary on record |
| Our reference | WID-OR-04130 |
In context
38 applications in Kendujhar since January 2022 are in the same category (Industry): 9 approved, 12 filed or under review, and 17 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 1,933.6 acres, this one is larger than 97% of them.
28 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Katesahi, Rugudi, Kendujhar, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Nuagaon Iron Ore Mine for Production of 20 MTPA(ROM) of Iron ore with Total… — lapsed, 0 m away
- Diversion of forest land for non forest purpose in Nuagaon Iron Ore Mines of… — in-principle approval, conditions pending, 600 m away
- Diversion of forest land over an area of 216.875 ha (including Safety Zone of… — under forest review, 1.4 km away
- Proposed Gandhalpada Iron Ore Mine of production capacity 10 MTPA (ROM) with… — environmental approval granted, 1.4 km away
- Proposed Gandhalpada Iron Ore Mine of production capacity 10 MTPA (ROM) with… — cleared for impact study, 1.4 km away
- Proposed Gandhalpada Iron Ore Mine of production capacity 10 MTPA (ROM) with… — cleared for impact study, 1.4 km away
- Diversion of Forest Land Over an Area 216.875 Ha (Including Safety Zone of… — more information requested, 1.4 km away
- Gandhalpada Iron Ore Block — lapsed, 1.4 km away
More from Jsw Steel LTD in Kendujhar
- Diversion of forest land for non forest purpose in Nuagaon Iron Ore Mines of… — in-principle approval, conditions pending
- Nuagaon Iron Ore Mine for Production of 20 MTPA(ROM) of Iron ore with Total… — lapsed
- Diversion of Forest Land for non forest purpose for construction of 132 KV… — more information requested
- Jajang Iron Ore Mine (ML Area: 666.150 Ha: as per RoR /669.078 Ha: as per DGPS… — returned to applicant
- Diversion of 46.757 ha of forest land (including 2.721 ha Safety zone) in… — lapsed
- Jajang Iron Ore mine of M/s JSW Steel Ltd for production of 12.80 MTPA (ROM)… — lapsed
7 Jsw Steel projects in Kendujhar
All 97 Jsw Steel projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.