Quick answers
What is this project?
Diversion of forest land for non forest purpose in Nuagaon Iron Ore Mines of M/s JSW Steel Ltd is a proposed mining project in Nu>G>N, Rugudi, Kendujhar, Odisha. The site covers 844.3 acres.
Who is building it?
The applicant is Jsw Steel LTD.
Has it been approved?
Not yet. The application is still under review: its status is “In-principle approval, conditions pending”, as of 27 Nov 2026.
Where is it?
In Nu>G>N, Rugudi, Kendujhar, Odisha.
How big is it?
It has a stated cost of ₹2,000 crore; a site of 844.3 acres and 498.4 acres (201.7 ha) of forest land.
When was it filed?
The application was filed on 20 Jan 2025.
Project details
| Status | In-principle approval, conditions pending |
|---|---|
| Status since | 16 Nov 2026 |
| Application filed | 20 Jan 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Mining |
| Applicant | Jsw Steel LTD |
| Land area | 844.3 acres (341.7 ha) |
| Forest land | 498.4 acres (201.7 ha) |
| Project cost | ₹2,000 crore |
| Village / locality | Nu>G>N |
| Taluk / tehsil | Rugudi |
| District | Kendujhar |
| State | Odisha |
| Location from | Site boundary on record |
| Our reference | WID-OR-04333 |
In context
213 applications in Kendujhar since January 2022 are in the same category (Mining): 110 approved, 46 filed or under review, and 57 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 844.3 acres, this one is larger than 80% of them.
No other mining lease on record is within 500 m of this site; 11 have applied within 5 km.
Where it is
Nu>G>N, Rugudi, Kendujhar, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Nuagaon Iron Ore Mine for Production of 20 MTPA(ROM) of Iron ore with Total… — lapsed, 600 m away
- Exploration work in Nuagaon Iron Ore Block of M/s JSW Steel Ltd — lapsed, 600 m away
- 0.268 Ha. of Forest Land Which Consists of General Approval Over 0.257 Ha. (… — forest land use approved, 1.4 km away
- Diversion of forest land over an area of 216.875 ha (including Safety Zone of… — under forest review, 1.6 km away
- Proposed Gandhalpada Iron Ore Mine of production capacity 10 MTPA (ROM) with… — environmental approval granted, 1.6 km away
- Proposed Gandhalpada Iron Ore Mine of production capacity 10 MTPA (ROM) with… — cleared for impact study, 1.6 km away
- Proposed Gandhalpada Iron Ore Mine of production capacity 10 MTPA (ROM) with… — cleared for impact study, 1.6 km away
- Gandhalpada Iron Ore Block — lapsed, 1.6 km away
More from Jsw Steel LTD in Kendujhar
- Nuagaon Iron Ore Mine for Production of 20 MTPA(ROM) of Iron ore with Total… — lapsed
- Diversion of Forest Land for non forest purpose for construction of 132 KV… — more information requested
- Jajang Iron Ore Mine (ML Area: 666.150 Ha: as per RoR /669.078 Ha: as per DGPS… — returned to applicant
- Diversion of 46.757 ha of forest land (including 2.721 ha Safety zone) in… — lapsed
- Exploration work in Nuagaon Iron Ore Block of M/s JSW Steel Ltd — lapsed
- Jajang Iron Ore mine of M/s JSW Steel Ltd for production of 12.80 MTPA (ROM)… — lapsed
7 Jsw Steel projects in Kendujhar
All 97 Jsw Steel projects across India