Quick answers
What is this project?
Integrated Project for Construction of 33 KV Transmission Line From 132 KV Grid-Sub Station, Nandira of Mcl, to Proposed Sub-Station of Balabhadra Ocp and Conveyor Corridor From Balaram Siding to Balabhadra Ocp of Mcl is a proposed mining project in Koilanagar, Colliery, Anugul, Odisha. The site covers 59 acres.
Who is building it?
The applicant is Mahanadi Coalfields Limited.
Has it been approved?
Not yet. The application is still under review: its status is “Initial checks”, as of 27 Nov 2026.
Where is it?
In Koilanagar, Colliery, Anugul, Odisha.
How big is it?
It has a stated cost of ₹511.1 crore; a site of 59 acres and 6.3 acres (2.6 ha) of forest land.
When was it filed?
The application was filed on 6 Sept 2026.
Project details
| Official title | Integrated Project for Construction of 33 KV Transmission Line From 132 KV Grid-Sub Station, Nandira of Mcl, to Proposed Sub-Station of Balabhadra Ocp and Conveyor Corridor From Balaram Siding to Balabhadra Ocp of Mcl in Angul District, Odisha. |
|---|---|
| Status | Initial checks |
| Status since | 7 Sept 2026 |
| Application filed | 6 Sept 2026 |
| Approval sought | Forest land use |
| Application type | Change of use |
| Sector | Mining |
| Applicant | Mahanadi Coalfields Limited |
| Land area | 59 acres (23.9 ha) |
| Forest land | 6.3 acres (2.6 ha) |
| Project cost | ₹511.1 crore |
| Village / locality | Koilanagar |
| Taluk / tehsil | Colliery |
| District | Anugul |
| State | Odisha |
| Location from | Site boundary on record |
| Our reference | WID-OR-04455 |
In context
108 applications in Anugul since January 2022 are in the same category (Mining): 50 approved, 25 filed or under review, and 33 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 59 acres, this one is smaller than 55% of them.
No other mining lease on record is within 500 m of this site; 4 have applied within 5 km.
Where it is
Koilanagar, Colliery, Anugul, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Integrated Project for Construction of 33 KV Transmission Line From 132 KV… — under forest review, 0 m away
- Balram OCP — more information requested, 2.1 km away
- Environmental Clearance for Production of country Liquor from the… — environmental approval granted, 2.8 km away
- Integrated Project for Construction of 33 KV Transmission Line From Nandira… — under forest review, 2.9 km away
- Integrated Project for Construction of 33 KV Transmission Line From Nandira… — not approved, 2.9 km away
- Integrated Project for Construction of 33 KV Transmission Line From Nandira… — initial checks, 2.9 km away
- Balabhadra OCP — environmental approval granted, 5 km away
- Balabhadra OCP — cleared for impact study, 5 km away
More from Mahanadi Coalfields Limited in Anugul
- Integrated Project for Construction of 33 KV Transmission Line From Nandira… — under forest review
- Integrated Project for Construction of 33 KV Transmission Line From 132 KV… — under forest review
- Bhubaneswari Expansion Ocp 50 Mty — under forest review
- Integrated Project for Construction of 33 KV Transmission Line From Nandira… — initial checks
- Integrated Project for Construction of 33 KV Transmission Line From Nandira… — not approved
- Balabhadra OCP — environmental approval granted
12 Mahanadi Coalfields projects in Anugul
All 23 Mahanadi Coalfields projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.