Quick answers
What is this project?
Integrated Project for Construction of 33 KV Transmission Line From Nandira Sub-Station of Mcl to Utkal-A Coal Mine (Subhadra Ocp) of Mcl is a rejected building project in Ambapal, Anugul, Odisha. The site covers 21,285.6 acres.
Who is building it?
The applicant is Mahanadi Coalfields Limited.
Has it been approved?
No. The application was rejected on 27 Apr 2026.
Where is it?
In Ambapal, Anugul, Odisha.
How big is it?
It has a stated cost of ₹223.7 crore; a site of 21,285.6 acres and 58.3 acres (23.6 ha) of forest land.
When was it filed?
The application was filed on 21 Feb 2026.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Integrated Project for Construction of 33 KV Transmission Line From Nandira Sub-Station…
Project details
| Official title | Integrated Project for Construction of 33 KV Transmission Line From Nandira Sub-Station of Mcl to Utkal-A Coal Mine (Subhadra Ocp) of Mcl in Angul District of Odisha and Railway Line From Angul-Balaram Rail Line (Mcrl Ph-1) Near Natada Village to Utkal-A Coal Mine (Subhadra Ocp) of Mcl in Angul District of Odisha. |
|---|---|
| Status | Not approved |
| Status since | 27 Apr 2026 |
| Application filed | 21 Feb 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Mahanadi Coalfields Limited |
| Land area | 21,285.6 acres (8,614 ha) |
| Forest land | 58.3 acres (23.6 ha) |
| Project cost | ₹223.7 crore |
| Village / locality | Ambapal |
| Taluk / tehsil | Anugul |
| District | Anugul |
| State | Odisha |
| Location from | Site boundary on record |
| Our reference | WID-OR-04534 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Change of use filed 2 Jul 2026 | Initial checks | 633.3 acres | ₹223.7 crore |
| New project filed 21 Feb 2026 (this page) | Not approved | 21,285.6 acres | ₹223.7 crore |
In context
19 applications in Anugul since January 2022 are in the same category (Buildings & townships): 3 approved, 3 filed or under review, and 12 withdrawn, lapsed or rejected. At 21,285.6 acres, this one is larger than 89% of them.
4 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Ambapal, Anugul, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Integrated Project for Construction of 33 KV Transmission Line From Nandira… — under forest review, 50 m away
- Environmental Clearance for Production of country Liquor from the… — environmental approval granted, 1.7 km away
- Integrated Project for Construction of 33 KV Transmission Line From Nandira… — initial checks, 2.2 km away
- Integrated Project for Construction of 33 KV Transmission Line From 132 KV… — initial checks, 2.9 km away
- Integrated Project for Construction of 33 KV Transmission Line From 132 KV… — under forest review, 2.9 km away
- Balram OCP — more information requested, 4.1 km away
- Development of Township at Kerjang, Angul, Odisha — lapsed, 5.1 km away
- 2 x 525 MW Coal Based Thermal Power Plant — environmental approval granted, 5.3 km away
More from Mahanadi Coalfields Limited in Anugul
- Integrated Project for Construction of 33 KV Transmission Line From Nandira… — under forest review
- Integrated Project for Construction of 33 KV Transmission Line From 132 KV… — initial checks
- Integrated Project for Construction of 33 KV Transmission Line From 132 KV… — under forest review
- Bhubaneswari Expansion Ocp 50 Mty — under forest review
- Balabhadra OCP — environmental approval granted
- Diversion of Forest Land by MCL in respect of Balabhadra OCP coming under… — more information requested
12 Mahanadi Coalfields projects in Anugul
All 23 Mahanadi Coalfields projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.