Quick answers
What is this project?
Integrated Project for Construction of 33 KV Transmission Line From Nandira Sub-Station of Mcl to Utkal-A Coal Mine (Subhadra Ocp) of Mcl is a proposed mining project in Ambapal, Anugul, Odisha. The site covers 633.3 acres.
Who is building it?
The applicant is Mahanadi Coalfields Limited.
Has it been approved?
Not yet. The application is still under review: its status is “Initial checks”, as of 27 Nov 2026.
Where is it?
In Ambapal, Anugul, Odisha.
How big is it?
It has a stated cost of ₹223.7 crore; a site of 633.3 acres and 48 acres (19.4 ha) of forest land.
When was it filed?
The application was filed on 2 Jul 2026.
Project details
| Official title | Integrated Project for Construction of 33 KV Transmission Line From Nandira Sub-Station of Mcl to Utkal-A Coal Mine (Subhadra Ocp) of Mcl in Angul District of Odisha and Railway Line From Angul-Balaram Rail Line (Mcrl Ph-1) Near Natada Village to Utkal-A Coal Mine (Subhadra Ocp) of Mcl in Angul District of Odisha. |
|---|---|
| Status | Initial checks |
| Status since | 3 Jul 2026 |
| Application filed | 2 Jul 2026 |
| Approval sought | Forest land use |
| Application type | Change of use |
| Sector | Mining |
| Applicant | Mahanadi Coalfields Limited |
| Land area | 633.3 acres (256.3 ha) |
| Forest land | 48 acres (19.4 ha) |
| Project cost | ₹223.7 crore |
| Village / locality | Ambapal |
| Taluk / tehsil | Anugul |
| District | Anugul |
| State | Odisha |
| Location from | Site boundary on record |
| Our reference | WID-OR-04381 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Change of use filed 2 Jul 2026 (this page) | Initial checks | 633.3 acres | ₹223.7 crore |
| New project filed 21 Feb 2026 | Not approved | 21,285.6 acres | ₹223.7 crore |
In context
108 applications in Anugul since January 2022 are in the same category (Mining): 50 approved, 25 filed or under review, and 33 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 633.3 acres, this one is larger than 55% of them.
No other mining lease on record is within 500 m of this site; 5 have applied within 5 km.
Where it is
Ambapal, Anugul, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Integrated Project for Construction of 33 KV Transmission Line From Nandira… — under forest review, 2.2 km away
- Integrated Project for Construction of 33 KV Transmission Line From Nandira… — not approved, 2.2 km away
- Integrated Project for Construction of 33 KV Transmission Line From 132 KV… — initial checks, 2.9 km away
- Integrated Project for Construction of 33 KV Transmission Line From 132 KV… — under forest review, 2.9 km away
- Environmental Clearance for Production of country Liquor from the… — environmental approval granted, 3.7 km away
- 2 x 525 MW Coal Based Thermal Power Plant — environmental approval granted, 4.1 km away
- 2 x 525 MW Coal Based Thermal Power Plant — environmental approval granted, 4.1 km away
- 2 x 525 MW Coal Based Thermal Power Plant — cleared for impact study, 4.1 km away
More from Mahanadi Coalfields Limited in Anugul
- Integrated Project for Construction of 33 KV Transmission Line From Nandira… — under forest review
- Integrated Project for Construction of 33 KV Transmission Line From 132 KV… — initial checks
- Integrated Project for Construction of 33 KV Transmission Line From 132 KV… — under forest review
- Bhubaneswari Expansion Ocp 50 Mty — under forest review
- Balabhadra OCP — environmental approval granted
- Diversion of Forest Land by MCL in respect of Balabhadra OCP coming under… — more information requested
12 Mahanadi Coalfields projects in Anugul
All 23 Mahanadi Coalfields projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.