What is Developing? Open the mapMap

More information requestedBuildings & townships · Cuttack, Odisha

Proposed 3x800 MW Coal Based Ultra Super Critical Nilanchal Thermal Power Plant by Orissa Thermal Energy Private Limited

Proposed 3x800 MW Coal Based Ultra Super Critical Nilanchal Thermal Power Plant by Orissa Thermal Energy Private Limited is a proposed building project in Khanduali, Khuntuni, Cuttack, Odisha. The site covers 819.1 acres. Its stated project cost is ₹27,438 crore. As of 27 Nov 2026, its status is “More information requested” (since 28 Oct 2026).

See it on the live map All projects in Cuttack

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed 3x800 MW Coal Based Ultra Super Critical Nilanchal Thermal Power Plant by…

Project details

Official titleProposed 3x800 MW Coal Based Ultra Super Critical Nilanchal Thermal Power Plant at Village Rahangol, Kandarei, Tehsil Athagarh, District Cuttack, Odisha by Orissa Thermal Energy Private Limited
StatusMore information requested
Status since28 Oct 2026
Application filed5 Feb 2026
Approval soughtForest land use
Application typeNew project
SectorBuildings & townships
ApplicantAdani Power Limited
Land area819.1 acres (331.5 ha)
Forest land39.5 acres (16 ha)
Project cost₹27,438 crore
Village / localityKhanduali
Taluk / tehsilKhuntuni
DistrictCuttack
StateOdisha
Location fromSite boundary on record
Our referenceWID-OR-04499

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 5 Feb 2026 (this page)More information requested819.1 acres₹27,438 crore
Amendment filed 13 Oct 2025Cleared for impact study819.1 acres₹27,438 crore

In context

43 applications in Cuttack since January 2022 are in the same category (Buildings & townships): 25 approved, 5 filed or under review, and 13 withdrawn, lapsed or rejected. The approved ones took a median of 6 months from filing to approval. At 819.1 acres, this one is larger than 93% of them.

6 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Khanduali, Khuntuni, Cuttack, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Adani Power Limited in Cuttack

6 Adani Power projects in Cuttack
All 68 Adani Power projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.