| Official title | Proposed 3x800 MW Coal Based Ultra Super Critical Nilanchal Thermal Power Plant at Village Rahangol, Kandarei, Tehsil Athagarh, District Cuttack, Odisha by Orissa Thermal Energy Private Limited |
|---|---|
| Status | Not approved |
| Status since | 14 Nov 2025 |
| Application filed | 8 Oct 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Adani Power Limited |
| Land area | 819.1 acres (331.5 ha) |
| Forest land | 39.5 acres (16 ha) |
| Project cost | ₹27,438 crore |
| Village / locality | Rahangol |
| Taluk / tehsil | Khuntuni |
| District | Cuttack |
| State | Odisha |
| Location from | Site boundary on record |
| Our reference | WID-OR-04537 |
What the filings say
What is planned
Adani Power Limited proposes the Nilanchal Thermal Power Plant, a 2,400 MW coal-based facility using ultra-supercritical technology. The project consists of three units, each with a capacity of 800 MW. The applicant's project report indicates the plant will be located across several villages including Rahangol, Kandarei, Dalua, Khanduali, Khuntuni, and Rampei in the Athagarh Tehsil of Cuttack district.
The project components include:
- Main plant area with three 800 MW units
- Coal handling system and storage yards
- Ash pond and ash handling systems
- Water reservoir and raw water intake system
- Cooling towers and circulating water systems
- A dedicated township for staff
- Greenbelt and open spaces
Layout and design
The site layout shows the main power block centrally located, with the ash pond positioned to the north. A large water reservoir is planned on the eastern side of the plant area. The coal handling area and railway sidings are situated to the west of the main units. The proposed township is located at the southern edge of the project site. The layout plan identifies ten specific boundary coordinates for the project area.
Land and surroundings
The project requires 331.49 hectares of land, of which 15.984 hectares is classified as forest land. The forest area consists of Eco-Class-I Open Forest. The applicant has identified land for compensatory afforestation in Adhuan village, Basudevpur Tehsil, Bhadrak district. Several private entities, including Durjaneeya Land Infracon Pvt Ltd, Dhyutidhara Infracon Private Limited, and Dayalu Developers Private Limited, have provided consent for the transfer of approximately 32.05 acres (12.97 hectares) of land for this purpose.
Water, power and access
Water for the plant will be managed through a comprehensive water balance system. The design includes a raw water reservoir with seven days of storage capacity. The system incorporates a central monitoring basin, a clarified water storage tank, and various treatment plants including a filtration plant, ultra-filtration, and reverse osmosis units. The plant is designed to operate with a closed-cycle cooling system using cooling towers. A coal handling system with a dedicated rail yard will provide the primary fuel access.
Environmental safeguards
The applicant has conducted baseline monitoring for air, water, soil, and noise levels. Air quality monitoring was conducted at 11 locations, focusing on PM10, PM2.5, SO2, NO2, and CO. Noise levels were measured at 11 locations for 24-hour periods. Water sampling was conducted at six surface water and six ground water locations.
To mitigate environmental impact, the project will use ultra-supercritical technology, which is intended to be more efficient than conventional sub-critical plants. The applicant has budgeted ₹178.52 lakh for compensatory afforestation and soil and moisture conservation. A greenbelt will be developed as part of the site plan.
Timeline and economics
The construction phase is estimated to last 60 months (5 years). During this period, the project is expected to employ 275 permanent and 175 temporary workers. Once operational, the plant is projected to provide direct employment to 400 people and indirect employment to 7,800 people over a 35-year operational life.
| Item | Detail |
|---|---|
| Total Capacity | 2,400 MW (3x800 MW) |
| Technology | Ultra Super Critical |
| Construction Period | 60 months |
| Permanent Jobs (Construction) | 275 |
| Direct Jobs (Operation) | 400 |
| Indirect Jobs (Operation) | 7,800 |
| Forest Land Diversion | 15.984 hectares |
Orissa Thermal Energy 3x800 MW Coal Based Ultra Super Critical Nilanchal Thermal Power Plant site plan and layout
4 drawings from the project's filings. Sign in free to see them.
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see itIn context
43 applications in Cuttack since January 2022 are in the same category (Buildings & townships): 25 approved, 5 filed or under review, and 13 withdrawn, lapsed or rejected. The approved ones took a median of 6 months from filing to approval. At 819.1 acres, this one is larger than 93% of them.
6 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Rahangol, Khuntuni, Cuttack, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Transfer of Terms of Reference (Change in Name) subsequently to NCLT Order… — cleared for impact study, 0 m away
- Proposed 3x800 MW Coal Based Ultra Super Critical Nilanchal Thermal Power… — more information requested, 0 m away
- Proposed 3x800 MW Coal Based Ultra Super Critical Nilanchal Thermal Power… — cleared for impact study, 0 m away
- Proposed 3x800 MW Coal Based Ultra Super Critical Nilanchal Thermal Power… — cleared for impact study, 0 m away
- 3x800 MW Nilanchal Ultra Super Critical Thermal Power Plant (USCTPP) by Orissa… — not approved, 50 m away
- Expansion of Steel Plant – DRI Kilns (Sponge Iron from 1,20,000 TPA to… — cleared for impact study, 2.2 km away
- Expansion of Steel Plant – DRI Kilns (Sponge Iron from 1,20,000 TPA to… — environmental approval granted, 2.2 km away
- Expansion of Cement Production Capacity (3.0 Million TPA to 6.0 Million TPA)… — cleared for impact study, 4.7 km away
More from Adani Power Limited in Cuttack
- Transfer of Terms of Reference (Change in Name) subsequently to NCLT Order… — cleared for impact study
- Proposed 3x800 MW Coal Based Ultra Super Critical Nilanchal Thermal Power… — more information requested
- Proposed 3x800 MW Coal Based Ultra Super Critical Nilanchal Thermal Power… — cleared for impact study
- Proposed 3x800 MW Coal Based Ultra Super Critical Nilanchal Thermal Power… — cleared for impact study
- 3x800 MW Nilanchal Ultra Super Critical Thermal Power Plant (USCTPP) by Orissa… — not approved
6 Adani Power projects in Cuttack
All 68 Adani Power projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.