What is Developing? Open the mapMap

Not approvedPower · Cuttack, Odisha

3x800 MW Nilanchal Ultra Super Critical Thermal Power Plant (USCTPP) by Orissa Thermal Energy Private Limited.

3x800 MW Nilanchal Ultra Super Critical Thermal Power Plant (USCTPP) by Orissa Thermal Energy Private Limited is a rejected power project in Dalua, Khuntuni, Cuttack, Odisha. The site covers 22.8 acres. Its stated project cost is ₹27 lakh. As of 27 Nov 2026, its status is “Not approved” (since 17 Jan 2025).

See it on the live map All projects in Cuttack

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

StatusNot approved
Status since17 Jan 2025
Application filed16 Dec 2024
Approval soughtForest land use
Application typeNew project
SectorPower
ApplicantAdani Power Limited
Land area22.8 acres (9.2 ha)
Forest land22.8 acres (9.2 ha)
Project cost₹27 lakh
Village / localityDalua
Taluk / tehsilKhuntuni
DistrictCuttack
StateOdisha
Location fromSite boundary on record
Our referenceWID-OR-04504

In context

7 applications in Cuttack since January 2022 are in the same category (Power): 4 approved, 2 filed or under review, and 1 withdrawn, lapsed or rejected.

9 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Dalua, Khuntuni, Cuttack, Odisha. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Adani Power Limited in Cuttack

6 Adani Power projects in Cuttack
All 68 Adani Power projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.