Quick answers
What is this project?
Proposed sand mining project (Boulder, gravel, sand) as per DSR NO. SEIAA/MS/2023/212 on the Sutlej River Bed having site no. :PO_SN_AR_ST_82 is a proposed mining project in Burj Tahatdas, Nawanshahr, Shahid Bhagat Singh Nagar, Punjab. The site covers 21.5 acres.
Who is building it?
The applicant is Executive Engineer-Cum- District Mining Officer.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 12 Feb 2024), as of 27 Nov 2026.
Where is it?
In Burj Tahatdas, Nawanshahr, Shahid Bhagat Singh Nagar, Punjab.
How big is it?
It has a stated cost of ₹6 crore and a site of 21.5 acres.
When was it filed?
The application was filed on 9 Feb 2024.
Project details
| Official title | Proposed sand mining project (Boulder, gravel, sand) as per DSR NO. SEIAA/MS/2023/212 on the Sutlej River Bed having site no. :PO_SN_AR_ST_82, located at village- Burj Tehal Dass, Tehsil & District- SBS Nagar, Punjab through XEN/DMO District SBS Nagar, Government of Punjab |
|---|---|
| Status | Cleared for impact study |
| Status since | 12 Feb 2024 |
| Application filed | 9 Feb 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Executive Engineer-Cum- District Mining Officer |
| Land area | 21.5 acres (8.7 ha) |
| Project cost | ₹6 crore |
| Village / locality | Burj Tahatdas |
| Taluk / tehsil | Nawanshahr |
| District | Shahid Bhagat Singh Nagar |
| State | Punjab |
| Location from | Site boundary on record |
| Our reference | WID-PB-00197 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 31 Jan 2025 | Returned to applicant | 21.5 acres | ₹6 crore |
| Early planning filed 9 Feb 2024 (this page) | Cleared for impact study | 21.5 acres | ₹6 crore |
In context
48 applications in Shahid Bhagat Singh Nagar since January 2022 are in the same category (Mining): 30 approved, 7 filed or under review, and 11 withdrawn, lapsed or rejected. The approved ones took a median of 38 days from filing to approval. At 21.5 acres, this one is larger than 67% of them.
2 other mining leases have applied within 500 m of this site; together with this one they cover 32.3 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 3 mining leases have applied within 5 km.
Where it is
Burj Tahatdas, Nawanshahr, Shahid Bhagat Singh Nagar, Punjab. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed sand mining project (Boulder, gravel, sand) as per DSR NO.… — returned to applicant, 0 m away
- Sand Mining Project located at Village- Burj Tehal Dass, Tehsil- Nawashehar,… — environmental approval granted, 300 m away
- Proposed Sand Mining (boulder, gravel, sand) project (site no… — environmental approval granted, 300 m away
- Desilting of River Sutlej — lapsed, 1.3 km away
- Desilting of River Sutlej — lapsed, 1.3 km away
- Desilting of River Sutlej — not approved, 1.3 km away
- Desilting of River Sutlej — not approved, 1.4 km away
- Sand Mining Project located in village- Khoja-3, District- SBS Nagar, State… — environmental approval granted, 5.4 km away
More from Executive Engineer-Cum- District Mining Officer in Shahid Bhagat Singh Nagar
- Proposed Sand Mining (boulder, gravel, sand) project (site no… — more information requested
- Proposed Sand Mining Project (site no. PO_SN_BL_ST_22) on the Sutlej riverbed — more information requested
- Proposed sand mining project on the Sutlej River Bed (PO_SN_AR_ST_69) — lapsed
- Sand Mining, Minor Mineral of Village Laalewal, Khoja, Tehsil Nawashehar,… — lapsed
- Sand Mining, Minor Mineral of Village Laalewal, Khoja, Tehsil Nawashehar,… — cleared for impact study
- Proposed sand mining project on the Sutlej River Bed (PO_SN_AR_ST_69) — cleared for impact study
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.