Quick answers
What is Desilting of River Sutlej?
Desilting of River Sutlej is a rejected mining project in Begowal, Nawanshahr, Shahid Bhagat Singh Nagar, Punjab. The site covers 27.3 acres.
Who is building it?
The applicant is Executive Engineer-Cum- District Mining Officer.
Has it been approved?
No. The application was rejected on 21 Apr 2026.
Where is it?
In Begowal, Nawanshahr, Shahid Bhagat Singh Nagar, Punjab.
How big is it?
It has a stated cost of ₹5.2 crore; a site of 27.3 acres and 27.3 acres (11.1 ha) of forest land.
When was it filed?
The application was filed on 11 Dec 2025.
Project details
| Official title | Desilting of River Sutlej in village Burj Tehal Dass opp. Burj Tehal Dass Complex (Part 2) to protect nearby abadies & agricultural land at Right Side of Sutlej River (RD 148000-151200/1-R Bandh) |
|---|---|
| Status | Not approved |
| Status since | 21 Apr 2026 |
| Application filed | 11 Dec 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Mining |
| Applicant | Executive Engineer-Cum- District Mining Officer |
| Land area | 27.3 acres (11.1 ha) |
| Forest land | 27.3 acres (11.1 ha) |
| Project cost | ₹5.2 crore |
| Village / locality | Begowal |
| Taluk / tehsil | Nawanshahr |
| District | Shahid Bhagat Singh Nagar |
| State | Punjab |
| Location from | Site boundary on record |
| Our reference | WID-PB-02827 |
In context
48 applications in Shahid Bhagat Singh Nagar since January 2022 are in the same category (Mining): 30 approved, 7 filed or under review, and 11 withdrawn, lapsed or rejected. The approved ones took a median of 38 days from filing to approval. At 27.3 acres, this one is larger than 81% of them.
No other mining lease on record is within 500 m of this site; 11 have applied within 5 km.
Where it is
Begowal, Nawanshahr, Shahid Bhagat Singh Nagar, Punjab. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Desilting of River Sutlej — lapsed, 100 m away
- Desilting of River Sutlej — lapsed, 100 m away
- Desilting of River Sutlej — not approved, 100 m away
- Sand Mining Project located at Village- Burj Tehal Dass, Tehsil- Nawashehar,… — environmental approval granted, 1.2 km away
- Proposed Sand Mining (boulder, gravel, sand) project (site no… — environmental approval granted, 1.2 km away
- Proposed sand mining project (Boulder, gravel, sand) as per DSR NO.… — returned to applicant, 1.4 km away
- Proposed sand mining project (Boulder, gravel, sand) as per DSR NO.… — cleared for impact study, 1.4 km away
- Sand Mining Project located in village- Khoja-3, District- SBS Nagar, State… — environmental approval granted, 4 km away
More from Executive Engineer-Cum- District Mining Officer in Shahid Bhagat Singh Nagar
- Proposed Sand Mining (boulder, gravel, sand) project (site no… — more information requested
- Proposed Sand Mining Project (site no. PO_SN_BL_ST_22) on the Sutlej riverbed — more information requested
- Proposed sand mining project on the Sutlej River Bed (PO_SN_AR_ST_69) — lapsed
- Sand Mining, Minor Mineral of Village Laalewal, Khoja, Tehsil Nawashehar,… — lapsed
- Sand Mining, Minor Mineral of Village Laalewal, Khoja, Tehsil Nawashehar,… — cleared for impact study
- Proposed sand mining project on the Sutlej River Bed (PO_SN_AR_ST_69) — cleared for impact study
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.