Quick answers
What is this project?
Sand Mining Project located at Village- Burj Tehal Dass, Tehsil- Nawashehar, District - SBS Nagar, Punjab is an approved mining project in Burj Tahatdas, Nawanshahr, Shahid Bhagat Singh Nagar, Punjab. The site covers 5.4 acres.
Who is building it?
The applicant is Varinderbir Singh.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 7 Nov 2026), as of 27 Nov 2026.
Where is it?
In Burj Tahatdas, Nawanshahr, Shahid Bhagat Singh Nagar, Punjab.
How big is it?
It has a stated cost of ₹45 lakh and a site of 5.4 acres.
When was it filed?
The application was filed on 1 Oct 2026.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 7 Nov 2026 |
| Application filed | 1 Oct 2026 |
| Approval sought | Environmental approval |
| Application type | Ownership transfer |
| Sector | Mining |
| Applicant | Varinderbir Singh |
| Land area | 5.4 acres (2.2 ha) |
| Project cost | ₹45 lakh |
| Village / locality | Burj Tahatdas |
| Taluk / tehsil | Nawanshahr |
| District | Shahid Bhagat Singh Nagar |
| State | Punjab |
| Location from | Site boundary on record |
| Our reference | WID-PB-01276 |
In context
48 applications in Shahid Bhagat Singh Nagar since January 2022 are in the same category (Mining): 30 approved, 7 filed or under review, and 11 withdrawn, lapsed or rejected. The approved ones took a median of 38 days from filing to approval. At 5.4 acres, this one is smaller than 81% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 26.9 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 2 mining leases have applied within 5 km.
Where it is
Burj Tahatdas, Nawanshahr, Shahid Bhagat Singh Nagar, Punjab. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Sand Mining (boulder, gravel, sand) project (site no… — environmental approval granted, 0 m away
- Proposed sand mining project (Boulder, gravel, sand) as per DSR NO.… — returned to applicant, 300 m away
- Proposed sand mining project (Boulder, gravel, sand) as per DSR NO.… — cleared for impact study, 300 m away
- Desilting of River Sutlej — lapsed, 1.1 km away
- Desilting of River Sutlej — lapsed, 1.1 km away
- Desilting of River Sutlej — not approved, 1.1 km away
- Desilting of River Sutlej — not approved, 1.2 km away
- Sand Mining Project located in village- Khoja-3, District- SBS Nagar, State… — environmental approval granted, 5.1 km away
More from Varinderbir Singh in Shahid Bhagat Singh Nagar
- Sand Mining Project located in village- Khoja-3, District- SBS Nagar, State… — environmental approval granted
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.