Quick answers
What is Desilting of River Sutlej?
Desilting of River Sutlej is a rejected building project in Burj Tahatdas, Nawanshahr, Shahid Bhagat Singh Nagar, Punjab. The site covers 37 acres.
Who is building it?
The applicant is Executive Engineer-Cum- District Mining Officer.
Has it been approved?
No. The application was rejected on 30 Jan 2026.
Where is it?
In Burj Tahatdas, Nawanshahr, Shahid Bhagat Singh Nagar, Punjab.
How big is it?
It has a stated cost of ₹6.9 crore; a site of 37 acres and 37 acres (15 ha) of forest land.
When was it filed?
The application was filed on 13 Jan 2026.
Project details
| Official title | Desilting of River Sutlej in village Burj Tehal Dass opp. Burj Tehal Dass Complex (Part 2) to protect nearby abadies & agricultural land at Right Side of Sutlej River (RD 148000-151200/1-R Bandh) |
|---|---|
| Status | Not approved |
| Status since | 30 Jan 2026 |
| Application filed | 13 Jan 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Executive Engineer-Cum- District Mining Officer |
| Land area | 37 acres (15 ha) |
| Forest land | 37 acres (15 ha) |
| Project cost | ₹6.9 crore |
| Village / locality | Burj Tahatdas |
| Taluk / tehsil | Nawanshahr |
| District | Shahid Bhagat Singh Nagar |
| State | Punjab |
| Location from | Site boundary on record |
| Our reference | WID-PB-01482 |
All filings for this project
This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 4 Mar 2026 | Lapsed | 37 acres | ₹6.9 crore |
| New project filed 17 Jan 2026 | Lapsed | 37 acres | ₹6.9 crore |
| New project filed 13 Jan 2026 (this page) | Not approved | 37 acres | ₹6.9 crore |
In context
5 applications in Shahid Bhagat Singh Nagar since January 2022 are in the same category (Buildings & townships): 0 approved, 1 filed or under review, and 4 withdrawn, lapsed or rejected.
12 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Burj Tahatdas, Nawanshahr, Shahid Bhagat Singh Nagar, Punjab. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Desilting of River Sutlej — lapsed, 0 m away
- Desilting of River Sutlej — lapsed, 0 m away
- Desilting of River Sutlej — not approved, 100 m away
- Sand Mining Project located at Village- Burj Tehal Dass, Tehsil- Nawashehar,… — environmental approval granted, 1.1 km away
- Proposed Sand Mining (boulder, gravel, sand) project (site no… — environmental approval granted, 1.1 km away
- Proposed sand mining project (Boulder, gravel, sand) as per DSR NO.… — returned to applicant, 1.3 km away
- Proposed sand mining project (Boulder, gravel, sand) as per DSR NO.… — cleared for impact study, 1.3 km away
- Sand Mining Project located in village- Khoja-3, District- SBS Nagar, State… — environmental approval granted, 4.1 km away
More from Executive Engineer-Cum- District Mining Officer in Shahid Bhagat Singh Nagar
- Proposed Sand Mining (boulder, gravel, sand) project (site no… — more information requested
- Proposed Sand Mining Project (site no. PO_SN_BL_ST_22) on the Sutlej riverbed — more information requested
- Proposed sand mining project on the Sutlej River Bed (PO_SN_AR_ST_69) — lapsed
- Sand Mining, Minor Mineral of Village Laalewal, Khoja, Tehsil Nawashehar,… — lapsed
- Sand Mining, Minor Mineral of Village Laalewal, Khoja, Tehsil Nawashehar,… — cleared for impact study
- Proposed sand mining project on the Sutlej River Bed (PO_SN_AR_ST_69) — cleared for impact study
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.