Quick answers
What is this project?
Expansion in the Existing Steel Manufacturing Unit by Increasing Capacity of Eaf From 32.3 Tph to 35.5 Tph for Increase in the Production Capacity of Steel Billets From 90,000 Tpa to 1,65,000 Tpa and Without Change in the Capacity of Ingots @ 30,000 Tpa Produced With 4 Tph of Induction Furnace, of Our Unit Namely M/S Aarti Steel Limited (Furnaces Division) Located at Plot No. B-30-1858, 1858/1 Dhandari Kalan/Phase III, Focal Point Jamalpur in Ludhiana, District- Ludhiana, Punjab is a lapsed industrial project in Ludhiana, Ludhiana (West), Punjab. The site covers 12 acres.
Who is building it?
The applicant is M/S Aarti Steel Limited (Furnaces Division).
Has it been approved?
No. The application was lapsed on 1 Feb 2025, so it is no longer under consideration.
Where is it?
In Ludhiana, Ludhiana (West), Punjab.
How big is it?
It has a stated cost of ₹121.6 crore and a site of 12 acres.
When was it filed?
The application was filed on 24 Dec 2024.
Project details
| Status | Lapsed |
|---|---|
| Status since | 1 Feb 2025 |
| Application filed | 24 Dec 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Industry |
| Applicant | M/S Aarti Steel Limited (Furnaces Division) |
| Land area | 12 acres (4.9 ha) |
| Project cost | ₹121.6 crore |
| Village / locality | Ludhiana |
| Taluk / tehsil | Ludhiana (West) |
| District | Ludhiana |
| State | Punjab |
| Location from | Site boundary on record |
| Our reference | WID-PB-00601 |
In context
98 applications in Ludhiana since January 2022 are in the same category (Industry): 56 approved, 14 filed or under review, and 28 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 12 acres, this one is larger than 77% of them.
47 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Ludhiana, Ludhiana (West), Punjab. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion of Existing Electric Arc Furnace Capacity From 30 Tph to 35.5 Tph… — cleared for impact study, 0 m away
- Expansion of Existing Electric Arc Furnace Capacity From 32.3 Tph to 35.5 Tph… — lapsed, 0 m away
- Expansion of existing EAF capacity from 32.3 TPH to 35.5 TPH for increase in… — lapsed, 0 m away
- Existing Steel Manufacturing Unit M/s Aarti Steel Limited (Rolling Mill… — cleared for impact study, 200 m away
- Existing Steel Manufacturing Unit M/s Aarti Steel Limited (Rolling Mill… — lapsed, 200 m away
- Existing Steel Manufacturing Unit M/s Aarti Steel Limited (Rolling Mill… — cleared for impact study, 200 m away
- Industrial project by M/s Modi Sales — lapsed, 800 m away
- Expansion of Existing Steel Manufacturing Unit under para 7(ii)(a) of EIA… — under environmental review, 850 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.