What is Developing? Open the mapMap

Cleared for impact studyIndustry · Ludhiana, Punjab

Expansion of Existing Electric Arc Furnace Capacity From 30 Tph to 35.5 Tph for Increase in the Production Capacity of Steel Billets From 90,000 Tpa to 1,65,000 Tpa and Without Change in the Production of Steel Ingots to the Tune of 30,000 Tpa Produced With Induction Furnace, of Our Unit Namely M/S Aarti Steel International Limited Located at Plot No. B-30-1858, 1858/1/Phase III, Focal Point, Ludhiana, Punjab.

Expansion of Existing Electric Arc Furnace Capacity From 30 Tph to 35.5 Tph for Increase in the Production Capacity of Steel Billets From 90,000 Tpa to 1,65,000 Tpa and Without Change in the Production of Steel Ingots to the Tune of 30,000 Tpa Produced With Induction Furnace, of Our Unit Namely M/S Aarti Steel International Limited Located at Plot No. B-30-1858, 1858/1/Phase III, Focal Point, Ludhiana, Punjab is a proposed industrial project in Ludhiana, Ludhiana (West), Punjab. The site covers 12 acres. Its stated project cost is ₹68.6 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 28 Dec 2025).

See it on the live map All projects in Ludhiana

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Expansion of Existing Electric Arc Furnace Capacity From 30 Tph to 35.5 Tph for Increase in the Production Capacity of Steel Billets From 90,000 Tpa to 1,65,000 Tpa and Without Change in the Production of Steel Ingots to the Tune of 30,000 Tpa Produced With Induction Furnace, of Our Unit Namely M/S Aarti Steel International Limited Located at Plot No. B-30-1858, 1858/1/Phase III, Focal Point, Ludhiana, Punjab is a proposed industrial project in Ludhiana, Ludhiana (West), Punjab. The site covers 12 acres.

Who is building it?

The applicant is Aarti Steel International Limited.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 28 Dec 2025), as of 27 Nov 2026.

Where is it?

In Ludhiana, Ludhiana (West), Punjab.

How big is it?

It has a stated cost of ₹68.6 crore and a site of 12 acres.

When was it filed?

The application was filed on 22 Dec 2025.

Project details

StatusCleared for impact study
Status since28 Dec 2025
Application filed22 Dec 2025
Approval soughtEnvironmental approval
Application typeEarly planning
SectorIndustry
ApplicantAarti Steel International Limited
Land area12 acres (4.9 ha)
Project cost₹68.6 crore
Village / localityLudhiana
Taluk / tehsilLudhiana (West)
DistrictLudhiana
StatePunjab
Location fromSite boundary on record
Our referenceWID-PB-00861

In context

98 applications in Ludhiana since January 2022 are in the same category (Industry): 56 approved, 14 filed or under review, and 28 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 12 acres, this one is larger than 77% of them.

47 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Ludhiana, Ludhiana (West), Punjab. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Aarti Steel International Limited in Ludhiana

All 6 Aarti Steel International projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.