Quick answers
What is Residential & Commercial Project of "M/S Bagga Brothers"?
Residential & Commercial Project of "M/S Bagga Brothers" is a proposed road project in Bhadak (93), Rajpura, Patiala, Punjab. The site covers 5.2 acres.
Who is building it?
The applicant is Bagga Brothers.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Bhadak (93), Rajpura, Patiala, Punjab.
How big is it?
It has a stated cost of ₹4 crore; a site of 5.2 acres and 190 m² of forest land.
When was it filed?
The application was filed on 30 Sept 2026.
Project details
| Status | More information requested |
|---|---|
| Status since | 31 Oct 2026 |
| Application filed | 30 Sept 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Bagga Brothers |
| Land area | 5.2 acres (2.1 ha) |
| Forest land | 190 m² |
| Project cost | ₹4 crore |
| Village / locality | Bhadak (93) |
| Taluk / tehsil | Rajpura |
| District | Patiala |
| State | Punjab |
| Location from | Site boundary on record |
| Our reference | WID-PB-03320 |
In context
68 applications in Patiala since January 2022 are in the same category (Roads & highways): 24 approved, 13 filed or under review, and 31 withdrawn, lapsed or rejected. The approved ones took a median of 15 months from filing to approval. At 5.2 acres, this one is larger than 71% of them.
22 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bhadak (93), Rajpura, Patiala, Punjab. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Permission for Laying 1000 MM dia water Supply pipeline — lapsed, 1.6 km away
- Permission of forest land construction of approach access to Sair Sapatta… — forest land use approved, 1.8 km away
- Proposed Industrial Unit for Manufacturing of Plasticizers and Chlorinated… — withdrawn, 1.9 km away
- Proposed Industrial Unit for Manufacturing of Plasticizers and Chlorinated… — cleared for impact study, 1.9 km away
- Expansion of the Existing Chloro Alkali Plant for Increase in the Production… — environmental approval granted, 2 km away
- Expansion of the Existing Chloro Alkali Plant for Increase in the Production… — cleared for impact study, 2 km away
- Expansion of the Existing Chloro Alkali Plant for Increase in the Production… — environmental approval granted, 2 km away
- Proposed Industrial Unit for Manufacturing of Chlorinated Methyl Fatty Ester… — environmental approval granted, 2.1 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.