What is Developing? Open the mapMap

Cleared for impact studyIndustry · Puducherry, Puducherry

Proposed regularization of the existing Rolling Mill - 39,600 TPA (through hot charging)

Proposed regularization of the existing Rolling Mill - 39,600 TPA (through hot charging) is a proposed industrial project in Eripakkam, Bahour Taluk, Puducherry. The site covers 8.4 acres. Its stated project cost is ₹8.3 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 17 Aug 2023).

See it on the live map All projects in Puducherry

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed regularization of the existing Rolling Mill - 39,600 TPA (through hot charging) is a proposed industrial project in Eripakkam, Bahour Taluk, Puducherry. The site covers 8.4 acres.

Who is building it?

The applicant is Pulkit Metals Private Limited.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 17 Aug 2023), as of 27 Nov 2026.

Where is it?

In Eripakkam, Bahour Taluk, Puducherry.

How big is it?

It has a stated cost of ₹8.3 crore and a site of 8.4 acres.

When was it filed?

The application was filed on 17 Aug 2023.

Project details

Official titleProposed regularization of the existing Rolling Mill - 39,600 TPA (through hot charging) along with Induction Furnace - 56,000 TPA Capacity as per Notification issued by MoEF&CC, New Delhi vide no. S.O.3250(E) dt 20th July 2022 & S.O. 3372 (E) dt. 26th July 2023 (amended)
StatusCleared for impact study
Status since17 Aug 2023
Application filed17 Aug 2023
Approval soughtEnvironmental approval
Application typeEarly planning
SectorIndustry
ApplicantPulkit Metals Private Limited
Land area8.4 acres (3.4 ha)
Project cost₹8.3 crore
Village / localityEripakkam
Taluk / tehsilBahour Taluk
DistrictPuducherry
StatePuducherry
Location fromSite boundary on record
Our referenceWID-PY-00016

In context

12 applications in Puducherry since January 2022 are in the same category (Industry): 7 approved, 1 filed or under review, and 4 withdrawn, lapsed or rejected. At 8.4 acres, this one is larger than 50% of them.

5 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Eripakkam, Bahour Taluk, Puducherry. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Pulkit Metals Private Limited in Puducherry

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.