Quick answers
What is this project?
Proposed regularization of the existing Rolling Mill - 39,600 TPA (through hot charging) is a proposed industrial project in Eripakkam, Bahour Taluk, Puducherry. The site covers 8.4 acres.
Who is building it?
The applicant is Pulkit Metals Private Limited.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 17 Aug 2023), as of 27 Nov 2026.
Where is it?
In Eripakkam, Bahour Taluk, Puducherry.
How big is it?
It has a stated cost of ₹8.3 crore and a site of 8.4 acres.
When was it filed?
The application was filed on 17 Aug 2023.
Project details
| Official title | Proposed regularization of the existing Rolling Mill - 39,600 TPA (through hot charging) along with Induction Furnace - 56,000 TPA Capacity as per Notification issued by MoEF&CC, New Delhi vide no. S.O.3250(E) dt 20th July 2022 & S.O. 3372 (E) dt. 26th July 2023 (amended) |
|---|---|
| Status | Cleared for impact study |
| Status since | 17 Aug 2023 |
| Application filed | 17 Aug 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Pulkit Metals Private Limited |
| Land area | 8.4 acres (3.4 ha) |
| Project cost | ₹8.3 crore |
| Village / locality | Eripakkam |
| Taluk / tehsil | Bahour Taluk |
| District | Puducherry |
| State | Puducherry |
| Location from | Site boundary on record |
| Our reference | WID-PY-00016 |
In context
12 applications in Puducherry since January 2022 are in the same category (Industry): 7 approved, 1 filed or under review, and 4 withdrawn, lapsed or rejected. At 8.4 acres, this one is larger than 50% of them.
5 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Eripakkam, Bahour Taluk, Puducherry. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed regularization of the existing Induction Furnace - 56,000 TPA… — lapsed, 0 m away
- "proposed Additional Construction of New Buildings to the Existing Buildings… — environmental approval granted, 600 m away
- "proposed Additional Construction of New Buildings to the Existing Buildings… — cleared for impact study, 600 m away
- Additional Buildings for Existing Auto Electrical Components Manufacturing Unit — environmental approval granted, 1.7 km away
- Expansion of Integrated Paint Manufacturing Unit at R S No. 53-56,… — cleared for impact study, 2.4 km away
- Proposed Expansion of Manufacturing Facility of Existing Sealants and Proposed… — cleared for impact study, 5.5 km away
- Proposed Expansion of Meenakshi Industries from 100 TPD to 250 TPD of MS… — cleared for impact study, 13.1 km away
- Proposed expansion of Meenakshi Steels from 100 TPD to 250 TPD of MS Billets… — cleared for impact study, 13.2 km away
More from Pulkit Metals Private Limited in Puducherry
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.