Quick answers
What is this project?
Additional Buildings for Existing Auto Electrical Components Manufacturing Unit is an approved industrial building project in Eripakkam, Bahour Taluk, Puducherry. The site covers 30.8 acres.
Who is building it?
The applicant is Lucas Tvs Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 9 Sept 2026), as of 27 Nov 2026.
Where is it?
In Eripakkam, Bahour Taluk, Puducherry.
How big is it?
It has a stated cost of ₹146.4 crore and a site of 30.8 acres.
When was it filed?
The application was filed on 31 Mar 2026.
Project details
| Official title | Construction of Additional Buildings for Existing Auto Electrical Components Manufacturing Unit |
|---|---|
| Status | Environmental approval granted |
| Status since | 9 Sept 2026 |
| Application filed | 31 Mar 2026 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Buildings & townships |
| Applicant | Lucas Tvs Limited |
| Use | Industrial |
| Land area | 30.8 acres (12.5 ha) |
| Built-up area | 24,056 m² (2,58,936 sq ft) |
| Plot area | 1,24,580 m² (13,40,967 sq ft) |
| Project cost | ₹146.4 crore |
| Village / locality | Eripakkam |
| Taluk / tehsil | Bahour Taluk |
| District | Puducherry |
| State | Puducherry |
| Location from | Site boundary on record |
| Our reference | WID-PY-00035 |
In context
80 applications in Puducherry since January 2022 are in the same category (Buildings & townships): 41 approved, 21 filed or under review, and 18 withdrawn, lapsed or rejected. The approved ones took a median of 8 months from filing to approval. At 30.8 acres, this one is larger than 92% of them.
5 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Eripakkam, Bahour Taluk, Puducherry. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "proposed Additional Construction of New Buildings to the Existing Buildings… — environmental approval granted, 1.3 km away
- "proposed Additional Construction of New Buildings to the Existing Buildings… — cleared for impact study, 1.3 km away
- Proposed regularization of the existing Rolling Mill - 39,600 TPA (through hot… — cleared for impact study, 1.7 km away
- Proposed regularization of the existing Induction Furnace - 56,000 TPA… — lapsed, 1.7 km away
- Expansion of Integrated Paint Manufacturing Unit at R S No. 53-56,… — cleared for impact study, 2 km away
- Proposed Expansion of Manufacturing Facility of Existing Sealants and Proposed… — cleared for impact study, 6.6 km away
- Proposed Expansion of Meenakshi Industries from 100 TPD to 250 TPD of MS… — cleared for impact study, 14.4 km away
- Proposed expansion of Meenakshi Steels from 100 TPD to 250 TPD of MS Billets… — cleared for impact study, 14.5 km away
All 3 Lucas Tvs projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.