Quick answers
What is this project?
Expansion of Integrated Paint Manufacturing Unit at R S No. 53-56, Pandasozhanallur village, Nettapakkam commune, Puducherry by Berger Paints India Limited is a proposed industrial project in Pandasozhanur, Bahour Taluk, Puducherry. The site covers 17.5 acres.
Who is building it?
The applicant is Berger Paints India Limited.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 13 Dec 2024), as of 27 Nov 2026.
Where is it?
In Pandasozhanur, Bahour Taluk, Puducherry.
How big is it?
It has a stated cost of ₹340 crore and a site of 17.5 acres.
When was it filed?
The application was filed on 3 Dec 2024.
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 13 Dec 2024 |
| Application filed | 3 Dec 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Berger Paints India Limited |
| Land area | 17.5 acres (7.1 ha) |
| Project cost | ₹340 crore |
| Village / locality | Pandasozhanur |
| Taluk / tehsil | Bahour Taluk |
| District | Puducherry |
| State | Puducherry |
| Location from | Site boundary on record |
| Our reference | WID-PY-00019 |
In context
12 applications in Puducherry since January 2022 are in the same category (Industry): 7 approved, 1 filed or under review, and 4 withdrawn, lapsed or rejected. At 17.5 acres, this one is larger than 92% of them.
5 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Pandasozhanur, Bahour Taluk, Puducherry. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "proposed Additional Construction of New Buildings to the Existing Buildings… — environmental approval granted, 1.8 km away
- "proposed Additional Construction of New Buildings to the Existing Buildings… — cleared for impact study, 1.8 km away
- Additional Buildings for Existing Auto Electrical Components Manufacturing Unit — environmental approval granted, 2 km away
- Proposed regularization of the existing Rolling Mill - 39,600 TPA (through hot… — cleared for impact study, 2.4 km away
- Proposed regularization of the existing Induction Furnace - 56,000 TPA… — lapsed, 2.4 km away
- Proposed Expansion of Manufacturing Facility of Existing Sealants and Proposed… — cleared for impact study, 7.8 km away
- Proposed Expansion of Additional construction of Hospital components in the… — environmental approval granted, 15 km away
- Existing Steel Melting Shop & Steel Rolling Mill in the unit of M/s. JBA Metal… — lapsed, 15.3 km away
All 13 Berger Paints India projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.