Quick answers
What is this project?
"proposed Additional Construction of New Buildings to the Existing Buildings of Industrial Buildings" in the Name of M/S. Mrf Limited is an approved industrial building project in Eripakkam, Bahour Taluk, Puducherry. The site covers 76.9 acres.
Who is building it?
The applicant is M/S Mrf LTD..
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 8 Jun 2026), as of 27 Nov 2026.
Where is it?
In Eripakkam, Bahour Taluk, Puducherry.
How big is it?
It has a stated cost of ₹2,818.5 crore and a site of 76.9 acres.
When was it filed?
The application was filed on 19 Jun 2025.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 8 Jun 2026 |
| Application filed | 19 Jun 2025 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Buildings & townships |
| Applicant | M/S Mrf LTD. |
| Use | Industrial |
| Land area | 76.9 acres (31.1 ha) |
| Built-up area | 1,49,462 m² (16,08,794 sq ft) |
| Plot area | 3,11,771 m² (33,55,872 sq ft) |
| Project cost | ₹2,818.5 crore |
| Village / locality | Eripakkam |
| Taluk / tehsil | Bahour Taluk |
| District | Puducherry |
| State | Puducherry |
| Location from | Site boundary on record |
| Our reference | WID-PY-00029 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 19 Jun 2025 (this page) | Environmental approval granted | 76.9 acres | ₹2,818.5 crore |
| Early planning filed 25 Apr 2025 | Cleared for impact study | 76.9 acres | ₹2,818.5 crore |
In context
80 applications in Puducherry since January 2022 are in the same category (Buildings & townships): 41 approved, 21 filed or under review, and 18 withdrawn, lapsed or rejected. The approved ones took a median of 8 months from filing to approval. At 76.9 acres, this one is larger than 96% of them.
4 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Eripakkam, Bahour Taluk, Puducherry. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "proposed Additional Construction of New Buildings to the Existing Buildings… — cleared for impact study, 0 m away
- Proposed regularization of the existing Rolling Mill - 39,600 TPA (through hot… — cleared for impact study, 600 m away
- Proposed regularization of the existing Induction Furnace - 56,000 TPA… — lapsed, 600 m away
- Additional Buildings for Existing Auto Electrical Components Manufacturing Unit — environmental approval granted, 1.3 km away
- Expansion of Integrated Paint Manufacturing Unit at R S No. 53-56,… — cleared for impact study, 1.8 km away
- Proposed Expansion of Manufacturing Facility of Existing Sealants and Proposed… — cleared for impact study, 6 km away
- Proposed Expansion of Meenakshi Industries from 100 TPD to 250 TPD of MS… — cleared for impact study, 13.7 km away
- Proposed expansion of Meenakshi Steels from 100 TPD to 250 TPD of MS Billets… — cleared for impact study, 13.8 km away
All 4 Mrf projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.