Environmental approval grantedBuildings & townships · Puducherry, Puducherry

"proposed Additional Construction of New Buildings to the Existing Buildings of Industrial Buildings" in the Name of M/S. Mrf Limited

"proposed Additional Construction of New Buildings to the Existing Buildings of Industrial Buildings" in the Name of M/S. Mrf Limited is an approved industrial building project in Eripakkam, Bahour Taluk, Puducherry. The site covers 76.9 acres. Its stated project cost is ₹2,818.5 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 8 Jun 2026).

See it on the live map All projects in Puducherry

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

"proposed Additional Construction of New Buildings to the Existing Buildings of Industrial Buildings" in the Name of M/S. Mrf Limited is an approved industrial building project in Eripakkam, Bahour Taluk, Puducherry. The site covers 76.9 acres.

Who is building it?

The applicant is M/S Mrf LTD..

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 8 Jun 2026), as of 27 Nov 2026.

Where is it?

In Eripakkam, Bahour Taluk, Puducherry.

How big is it?

It has a stated cost of ₹2,818.5 crore and a site of 76.9 acres.

When was it filed?

The application was filed on 19 Jun 2025.

Project details

StatusEnvironmental approval granted
Status since8 Jun 2026
Application filed19 Jun 2025
Approval soughtEnvironmental approval
Application typeExpansion
SectorBuildings & townships
ApplicantM/S Mrf LTD.
UseIndustrial
Land area76.9 acres (31.1 ha)
Built-up area1,49,462 m² (16,08,794 sq ft)
Plot area3,11,771 m² (33,55,872 sq ft)
Project cost₹2,818.5 crore
Village / localityEripakkam
Taluk / tehsilBahour Taluk
DistrictPuducherry
StatePuducherry
Location fromSite boundary on record
Our referenceWID-PY-00029

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Expansion filed 19 Jun 2025 (this page)Environmental approval granted76.9 acres₹2,818.5 crore
Early planning filed 25 Apr 2025Cleared for impact study76.9 acres₹2,818.5 crore

In context

80 applications in Puducherry since January 2022 are in the same category (Buildings & townships): 41 approved, 21 filed or under review, and 18 withdrawn, lapsed or rejected. The approved ones took a median of 8 months from filing to approval. At 76.9 acres, this one is larger than 96% of them.

4 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Eripakkam, Bahour Taluk, Puducherry. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

All 4 Mrf projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.