Quick answers
What is Bajri Mining Project, Plot No 62 (33)?
Bajri Mining Project, Plot No 62 (33) is a proposed mining project in Aminpura Chak, Tonk, Rajasthan. The site covers 154 acres.
Who is building it?
The applicant is Jai Prakash Maharishi.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 25 Jul 2025), as of 27 Nov 2026.
Where is it?
In Aminpura Chak, Tonk, Rajasthan.
How big is it?
It has a stated cost of ₹6.5 crore and a site of 154 acres.
When was it filed?
The application was filed on 23 Jul 2025.
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 25 Jul 2025 |
| Application filed | 23 Jul 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Jai Prakash Maharishi |
| Land area | 154 acres (62.3 ha) |
| Project cost | ₹6.5 crore |
| Village / locality | Aminpura Chak |
| Taluk / tehsil | Tonk |
| District | Tonk |
| State | Rajasthan |
| Location from | Site boundary on record |
| Our reference | WID-RJ-27591 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 15 Jan 2026 | Lapsed | 154 acres | ₹6.5 crore |
| Early planning filed 23 Jul 2025 (this page) | Cleared for impact study | 154 acres | ₹6.5 crore |
In context
362 applications in Tonk since January 2022 are in the same category (Mining): 227 approved, 30 filed or under review, and 105 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 154 acres, this one is larger than 89% of them.
No other mining lease on record is within 500 m of this site; 1 has applied within 5 km.
Where it is
Aminpura Chak, Tonk, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Bajri Mining Project, Plot No 62 (33) — lapsed, 0 m away
- Proposed Project of Bajri (River Sand) Minor Mineral Mining Project, Plot No.-… — cleared for impact study, 4.5 km away
- Proposed River Sand (Bajri) Mining Project, Plot No. 55(15), (Area-77.1758… — cleared for impact study, 5.3 km away
- Corrigendum on Environment Clearance Granted on 10.07.2023 for Lease — lapsed, 5.5 km away
- Proposed Project of Bajri (River Sand) Mining Project, Lease Area 40.75 ha.… — lapsed, 5.8 km away
- Proposed Project of Bajri (River Sand) Mining Project, Lease Area 40.75 ha.… — cleared for impact study, 5.8 km away
- Proposed Project of Bajri (River Sand) Mining Project, Lease Area 40.75 ha.… — cleared for impact study, 5.8 km away
- Amendment in ToR for Change in Proposed Production Capacity from 3062329.2 TPA… — cleared for impact study, 6.9 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.