Quick answers
What is this project?
Proposed 400 kV S/C on D/C Transmission line from Adani Renewable Energy Holding Four Limited SS at Badi Sid to Power Grid Corporation India Limited Bhadla-II SS near Village Kaansingh ki Sid, Taluka Bap, District Jodhpur, Rajasthan is a proposed power project in Kanji Ki Sird, Bap, Jodhpur, Rajasthan. The site covers 122.9 acres.
Who is building it?
The applicant is Adani Renewable Energy Holding Four Limited.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Kanji Ki Sird, Bap, Jodhpur, Rajasthan.
How big is it?
It has a stated cost of ₹30 crore; a site of 122.9 acres and 41 acres (16.6 ha) of forest land.
When was it filed?
The application was filed on 5 Mar 2024.
Project details
| Official title | Construction of proposed 400 kV S/C on D/C Transmission line from Adani Renewable Energy Holding Four Limited SS at Badi Sid to Power Grid Corporation India Limited Bhadla-II SS near Village Kaansingh ki Sid, Taluka Bap, District Jodhpur, Rajasthan |
|---|---|
| Status | More information requested |
| Status since | 23 Jul 2026 |
| Application filed | 5 Mar 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Power |
| Applicant | Adani Renewable Energy Holding Four Limited |
| Land area | 122.9 acres (49.8 ha) |
| Forest land | 41 acres (16.6 ha) |
| Project cost | ₹30 crore |
| Village / locality | Kanji Ki Sird |
| Taluk / tehsil | Bap |
| District | Jodhpur |
| State | Rajasthan |
| Location from | Site boundary on record |
| Our reference | WID-RJ-36090 |
In context
17 applications in Jodhpur since January 2022 are in the same category (Power): 7 approved, 8 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 15 months from filing to approval. At 122.9 acres, this one is smaller than 94% of them.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kanji Ki Sird, Bap, Jodhpur, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- 220 Kv D/C Line from Project Nine Renewable Power Private Limited Solar Plant… — under forest review, 850 m away
- 220 KV S/C Transmission Line from AMP Solar PSS to 765KV GSS (Bhadla -II ) By… — forest land use approved, 5.3 km away
- Project Nine Renewable Power Private Limited — lapsed, 5.3 km away
- Double circuit Tower 220 KV S/C Transmission Line connecting 300MW Solarpack… — forest land use approved, 5.8 km away
- "Construction of Common pooling Sub-station station 2 (PSS -2) - Common… — forest land use approved, 9.8 km away
- Approach Access for Reliance BP Mobility Limited Retail Outlet on Jaisalmer… — initial checks, 10.3 km away
- 400 kV S/c line on D/c towers from Azure Power India Pvt. Ltd. Solar Power… — more information requested, 10.8 km away
- Proposed Masonry Stone STP Mining Project, Reference No.:- 202410000107086,… — environmental approval granted, 24.9 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.