Forest land use approvedPower · Jodhpur, Rajasthan

220 KV S/C Transmission Line from AMP Solar PSS to 765KV GSS (Bhadla -II ) By AMP Energy Green Private Limited

220 KV S/C Transmission Line from AMP Solar PSS to 765KV GSS (Bhadla -II ) By AMP Energy Green Private Limited is an approved power project in Bari Sid, Bap, Jodhpur, Rajasthan. The site covers 769.5 acres. Its stated project cost is ₹12 crore. As of 27 Nov 2026, its status is “Forest land use approved” (since 27 Jul 2026).

See it on the live map All projects in Jodhpur

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

220 KV S/C Transmission Line from AMP Solar PSS to 765KV GSS (Bhadla -II ) By AMP Energy Green Private Limited is an approved power project in Bari Sid, Bap, Jodhpur, Rajasthan. The site covers 769.5 acres.

Who is building it?

The applicant is Amp Energy Green Private Limited.

Has it been approved?

Yes. Its status is “Forest land use approved” (since 27 Jul 2026), as of 27 Nov 2026.

Where is it?

In Bari Sid, Bap, Jodhpur, Rajasthan.

How big is it?

It has a stated cost of ₹12 crore; a site of 769.5 acres and 3,500 m² of forest land.

When was it filed?

The application was filed on 17 Mar 2023.

Project details

Official titleConstruction of 220 KV S/C Transmission Line from AMP Solar PSS to 765KV GSS (Bhadla -II ) By AMP Energy Green Private Limited
StatusForest land use approved
Status since27 Jul 2026
Application filed17 Mar 2023
Approval soughtForest land use
Application typeNew project
SectorPower
ApplicantAmp Energy Green Private Limited
Land area769.5 acres (311.4 ha)
Forest land3,500 m²
Project cost₹12 crore
Village / localityBari Sid
Taluk / tehsilBap
DistrictJodhpur
StateRajasthan
Location fromSite boundary on record
Our referenceWID-RJ-36688

In context

17 applications in Jodhpur since January 2022 are in the same category (Power): 7 approved, 8 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 15 months from filing to approval. At 769.5 acres, this one is smaller than 59% of them.

2 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Bari Sid, Bap, Jodhpur, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.