Quick answers
What is this project?
400 kV S/c line on D/c towers from Azure Power India Pvt. Ltd. Solar Power Project – Bhadla‑II Pooling Station is a proposed power project in Kishnari Jeti, Bap, Jodhpur, Rajasthan. The site covers 1,174.9 acres.
Who is building it?
The applicant is Azure Power India Private Limited.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Kishnari Jeti, Bap, Jodhpur, Rajasthan.
How big is it?
It has a stated cost of ₹41 lakh; a site of 1,174.9 acres and 3.2 acres (1.3 ha) of forest land.
When was it filed?
The application was filed on 21 Sept 2026.
Project details
| Status | More information requested |
|---|---|
| Status since | 18 Nov 2026 |
| Application filed | 21 Sept 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Power |
| Applicant | Azure Power India Private Limited |
| Land area | 1,174.9 acres (475.5 ha) |
| Forest land | 3.2 acres (1.3 ha) |
| Project cost | ₹41 lakh |
| Village / locality | Kishnari Jeti |
| Taluk / tehsil | Bap |
| District | Jodhpur |
| State | Rajasthan |
| Location from | Site boundary on record |
| Our reference | WID-RJ-36602 |
In context
17 applications in Jodhpur since January 2022 are in the same category (Power): 7 approved, 8 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 15 months from filing to approval. At 1,174.9 acres, this one is larger than 59% of them.
Where it is
Kishnari Jeti, Bap, Jodhpur, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Double circuit Tower 220 KV S/C Transmission Line connecting 300MW Solarpack… — forest land use approved, 5.1 km away
- 220 KV S/C Transmission Line from AMP Solar PSS to 765KV GSS (Bhadla -II ) By… — forest land use approved, 5.6 km away
- Project Nine Renewable Power Private Limited — lapsed, 5.6 km away
- 220 Kv D/C Line from Project Nine Renewable Power Private Limited Solar Plant… — under forest review, 10.7 km away
- Proposed 400 kV S/C on D/C Transmission line from Adani Renewable Energy… — more information requested, 10.8 km away
- "Construction of Common pooling Sub-station station 2 (PSS -2) - Common… — forest land use approved, 16.1 km away
- Approach Access for Reliance BP Mobility Limited Retail Outlet on Jaisalmer… — initial checks, 19 km away
- Proposed Masonry Stone STP Mining Project, Reference No.:- 202410000107086,… — environmental approval granted, 34.3 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.