Quick answers
What is this project?
Double circuit Tower 220 KV S/C Transmission Line connecting 300MW Solarpack Corporacion Tecnologica, S.A at Bay A209 in 765/400/220KV Bhadla-II Substation POWERGRID M/s Solarpack Corporacion Tecnologica, S.A Badi Seed, Tehsil-Bap, Jodhpur(Rajasthan) is an approved power project in Bari Sid, Bap, Jodhpur, Rajasthan. The site covers 657 acres.
Who is building it?
The applicant is Solarpack Corporacion Tecnologica Sociedad Anonima Unipersonal.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 24 Apr 2026), as of 27 Nov 2026.
Where is it?
In Bari Sid, Bap, Jodhpur, Rajasthan.
How big is it?
It has a stated cost of ₹1,200 crore; a site of 657 acres and 3,500 m² of forest land.
When was it filed?
The application was filed on 22 Aug 2023.
Project details
| Official title | Construction of Double circuit Tower 220 KV S/C Transmission Line connecting 300MW Solarpack Corporacion Tecnologica, S.A at Bay A209 in 765/400/220KV Bhadla-II Substation POWERGRID M/s Solarpack Corporacion Tecnologica, S.A Badi Seed, Tehsil-Bap, Jodhpur(Rajasthan) |
|---|---|
| Status | Forest land use approved |
| Status since | 24 Apr 2026 |
| Application filed | 22 Aug 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Power |
| Applicant | Solarpack Corporacion Tecnologica Sociedad Anonima Unipersonal |
| Land area | 657 acres (265.9 ha) |
| Forest land | 3,500 m² |
| Project cost | ₹1,200 crore |
| Village / locality | Bari Sid |
| Taluk / tehsil | Bap |
| District | Jodhpur |
| State | Rajasthan |
| Location from | Site boundary on record |
| Our reference | WID-RJ-36244 |
In context
17 applications in Jodhpur since January 2022 are in the same category (Power): 7 approved, 8 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 15 months from filing to approval. At 657 acres, this one is smaller than 71% of them.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bari Sid, Bap, Jodhpur, Rajasthan. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- 220 KV S/C Transmission Line from AMP Solar PSS to 765KV GSS (Bhadla -II ) By… — forest land use approved, 600 m away
- Project Nine Renewable Power Private Limited — lapsed, 650 m away
- 400 kV S/c line on D/c towers from Azure Power India Pvt. Ltd. Solar Power… — more information requested, 5.1 km away
- 220 Kv D/C Line from Project Nine Renewable Power Private Limited Solar Plant… — under forest review, 5.7 km away
- Proposed 400 kV S/C on D/C Transmission line from Adani Renewable Energy… — more information requested, 5.8 km away
- "Construction of Common pooling Sub-station station 2 (PSS -2) - Common… — forest land use approved, 12.6 km away
- Approach Access for Reliance BP Mobility Limited Retail Outlet on Jaisalmer… — initial checks, 14.7 km away
- Proposed Masonry Stone STP Mining Project, Reference No.:- 202410000107086,… — environmental approval granted, 29.9 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.