Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 15 Mar 2025 |
| Application filed | 16 Nov 2024 |
| Approval sought | Environmental approval |
| Application type | Amendment |
| Sector | Water & irrigation |
| Applicant | Sikkim Urja Limited |
| Land area | 249.4 acres (100.9 ha) |
| Project cost | ₹18,154.5 crore |
| Village / locality | Lingdong |
| Taluk / tehsil | Mangan |
| District | North District |
| State | Sikkim |
| Location from | Site boundary on record |
| Our reference | WID-SK-00009 |
In context
12 applications in North District since January 2022 are in the same category (Water & irrigation): 9 approved, 0 filed or under review, and 3 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 249.4 acres, this one is larger than 75% of them.
6 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Lingdong, Mangan, North District, Sikkim. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of 2.5149 ha of forest land for construction of HEP (2x3=6 MW) on… — forest land use approved, 2.3 km away
- Diversion of 2.5149 ha of forest land for construction of HEP (2x3=6 MW) on… — lapsed, 2.3 km away
- Teesta Hydroelectric Project Stage-III (1200 MW) — environmental approval granted, 3.6 km away
- Teesta Hydroelectric Project Stage-III (1200 MW) — withdrawn, 3.6 km away
- Diversion of Forest Land Required for Realignment Between Km 80.800 to Km… — lapsed, 4.4 km away
- Diversion of 2.895 ha of forest land for const of 10 MW New Meyong Chu HEP at… — forest land use approved, 4.6 km away
- Diversion of 3.058 Ha of forest land for rehabilitation site for flashflood or… — not approved, 4.7 km away
- Diversion of 3.102 Ha of Forest Land for Rehabilitation Site for Flashflood Or… — not approved, 4.8 km away
More from Sikkim Urja Limited in North District
- Teesta Hydroelectric Project Stage-III (1200 MW) — environmental approval granted
- Teesta Hydroelectric Project Stage-III (1200 MW) — withdrawn
All 3 Sikkim Urja projects across India