Quick answers
What is Multi Village Water Supply Scheme under Jal Jeevan Mission?
Multi Village Water Supply Scheme under Jal Jeevan Mission is a proposed water and irrigation project in Kyongnosla Forest Block, Gangtok, East District, Sikkim. The site covers 0.2 acres.
Who is building it?
The applicant is Rural Development.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Kyongnosla Forest Block, Gangtok, East District, Sikkim.
How big is it?
It has a stated cost of ₹131.7 crore; a site of 0.2 acres and 3.2 acres (1.3 ha) of forest land.
When was it filed?
The application was filed on 17 Jul 2023.
Project details
| Status | More information requested |
|---|---|
| Status since | 23 Jan 2026 |
| Application filed | 17 Jul 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Water & irrigation |
| Applicant | Rural Development |
| Land area | 1,000 m² |
| Forest land | 3.2 acres (1.3 ha) |
| Project cost | ₹131.7 crore |
| Village / locality | Kyongnosla Forest Block |
| Taluk / tehsil | Gangtok |
| District | East District |
| State | Sikkim |
| Location from | Site boundary on record |
| Our reference | WID-SK-00022 |
In context
14 applications in East District since January 2022 are in the same category (Water & irrigation): 2 approved, 7 filed or under review, and 4 withdrawn, lapsed or rejected. At 0.2 acres, this one is larger than 55% of them.
3 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kyongnosla Forest Block, Gangtok, East District, Sikkim. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- 4G Saturation — more information requested, 1.5 km away
- 4G Saturation — lapsed, 1.5 km away
- Diversion of 0.0186 Hectares Forest Land by Bsnl for the Installation of… — more information requested, 2 km away
- Diversion of 191.621 Acres Forest Land Between Milestone-4 to Milestone-13 — lapsed, 6.4 km away
- 11 MLD Water Treatment Plant (WTP) and Approach Road at Bhusuk under Sikkim… — more information requested, 7.1 km away
- Construction of Cavern by 3/11 Gr at General Area of Rajgarh — initial checks, 8 km away
- Diversion of Forest Land of 1.6 Ha from Chola to Yak La Pass for operational… — lapsed, 8.4 km away
- Diversion of 0.427 ha of forest land for construction of Evacuation Centre cum… — under forest review, 8.5 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.