Quick answers
What is 4G Saturation?
4G Saturation is a lapsed telecom project in Kyongnosla Forest Block, Gangtok, East District, Sikkim. The site covers 0 acres.
Who is building it?
The applicant is Mahesh Nair.
Has it been approved?
No. The application was lapsed on 13 Aug 2025, so it is no longer under consideration.
Where is it?
In Kyongnosla Forest Block, Gangtok, East District, Sikkim.
How big is it?
It has a stated cost of ₹75 lakh; a site of 0 acres and 200 m² of forest land.
When was it filed?
The application was filed on 20 Dec 2022.
One of 2 filings for this project. The project's main page, with every filing and where each stands: 4G Saturation
Project details
| Status | Lapsed |
|---|---|
| Status since | 13 Aug 2025 |
| Application filed | 20 Dec 2022 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Telecom |
| Applicant | Mahesh Nair |
| Land area | 100 m² |
| Forest land | 200 m² |
| Project cost | ₹75 lakh |
| Village / locality | Kyongnosla Forest Block |
| Taluk / tehsil | Gangtok |
| District | East District |
| State | Sikkim |
| Location from | Site boundary on record |
| Our reference | WID-SK-00029 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 20 Jun 2023 | More information requested | 0 acres | ₹75 lakh |
| New project filed 20 Dec 2022 (this page) | Lapsed | 0 acres | ₹75 lakh |
In context
13 applications in East District since January 2022 are in the same category (Telecom): 2 approved, 4 filed or under review, and 7 withdrawn, lapsed or rejected. At 0 acres, this one is smaller than 100% of them.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kyongnosla Forest Block, Gangtok, East District, Sikkim. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- 4G Saturation — more information requested, 0 m away
- Multi Village Water Supply Scheme under Jal Jeevan Mission — more information requested, 1.5 km away
- Diversion of 0.0186 Hectares Forest Land by Bsnl for the Installation of… — more information requested, 3.4 km away
- Diversion of 191.621 Acres Forest Land Between Milestone-4 to Milestone-13 — lapsed, 5 km away
- 11 MLD Water Treatment Plant (WTP) and Approach Road at Bhusuk under Sikkim… — more information requested, 5.5 km away
- Diversion of 0.427 ha of forest land for construction of Evacuation Centre cum… — under forest review, 7.1 km away
- Diversion of 10.559 Ha of Forest land at Bulbulay Reserve Forest for… — under forest review, 8.6 km away
- Diversion of forest land for establishment of Retired Armed Police Sanstha… — not approved, 8.7 km away
More from Mahesh Nair in East District
- Diversion of 0.0186 Hectares Forest Land by Bsnl for the Installation of… — more information requested
- 4G Saturation — more information requested
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.