Quick answers
What is 4G Saturation?
4G Saturation is a proposed telecom project in Naitam, Gangtok, East District, Sikkim. The site covers 0 acres.
Who is building it?
The applicant is Mahesh Nair.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Naitam, Gangtok, East District, Sikkim.
How big is it?
It has a stated cost of ₹75 lakh; a site of 0 acres and 220 m² of forest land.
When was it filed?
The application was filed on 21 Jun 2023.
Project details
| Status | More information requested |
|---|---|
| Status since | 16 Nov 2023 |
| Application filed | 21 Jun 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Telecom |
| Applicant | Mahesh Nair |
| Land area | 200 m² |
| Forest land | 220 m² |
| Project cost | ₹75 lakh |
| Village / locality | Naitam |
| Taluk / tehsil | Gangtok |
| District | East District |
| State | Sikkim |
| Location from | Site boundary on record |
| Our reference | WID-SK-00221 |
In context
13 applications in East District since January 2022 are in the same category (Telecom): 2 approved, 4 filed or under review, and 7 withdrawn, lapsed or rejected. At 0 acres, this one is smaller than 82% of them.
11 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Naitam, Gangtok, East District, Sikkim. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of 0.02 Ha of Forest Land for the Construction of 62mtr Span Steel… — initial checks, 2.7 km away
- Diversion of Forest Land of 0.0392 Ha for Laying of Pipeline and Construction… — under forest review, 3.7 km away
- Diversion of Forest Land of 0.0392 Ha for Laying of Pipeline and Construction… — lapsed, 3.7 km away
- Diversion of Forest Land for Laying of Ofc Cable of Gaok-Enb-0025 Connecting… — lapsed, 4.1 km away
- Diversion of 0.6396 Ha of Forest Land (0.2429 Ha in Gangtok Division & 0.3967… — more information requested, 4.5 km away
- Proposed roof-top Swimming Pool of "WEST POINT" - Integrated Commercial cum… — environmental approval granted, 4.6 km away
- Proposed Vertical Expansion by 3 Floors of "WEST POINT" - Integrated… — environmental approval granted, 4.6 km away
- Development of Residential Complex by Sm Infrastructure Private Limited — withdrawn, 4.6 km away
More from Mahesh Nair in East District
- Diversion of 0.0186 Hectares Forest Land by Bsnl for the Installation of… — more information requested
- 4G Saturation — more information requested
- 4G Saturation — lapsed