Quick answers
What is Sikkim Integrated Urban Development Project?
Sikkim Integrated Urban Development Project is a proposed project in Pakyong Forest Block, Pakyong, East District, Sikkim. The site covers 0.5 acres.
Who is building it?
The applicant is Urban Development Department.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Pakyong Forest Block, Pakyong, East District, Sikkim.
How big is it?
It has a stated cost of ₹6.9 crore; a site of 0.5 acres and 2,100 m² of forest land.
When was it filed?
The application was filed on 2 Aug 2025.
Project details
| Status | More information requested |
|---|---|
| Status since | 29 Jul 2026 |
| Application filed | 2 Aug 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Other |
| Applicant | Urban Development Department |
| Land area | 2,100 m² |
| Forest land | 2,100 m² |
| Project cost | ₹6.9 crore |
| Village / locality | Pakyong Forest Block |
| Taluk / tehsil | Pakyong |
| District | East District |
| State | Sikkim |
| Location from | Site boundary on record |
| Our reference | WID-SK-00175 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 2 Aug 2025 (this page) | More information requested | 0.5 acres | ₹6.9 crore |
| New project filed 2 Aug 2025 | Lapsed | 1 acre | ₹4.5 crore |
In context
34 applications in East District since January 2022 are in the same category (Other): 1 approved, 13 filed or under review, and 5 withdrawn, lapsed or rejected. At 0.5 acres, this one is smaller than 81% of them.
7 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Pakyong Forest Block, Pakyong, East District, Sikkim. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Sewerage Treatment Plant at Golitar Singtam East Sikkim — more information requested, 100 m away
- Rehabilitation of Sewerage System of Singtam Town — more information requested, 150 m away
- Widening of Existing Carriageway Into 2 Lanes With Paved Shoulder… — more information requested, 2.1 km away
- 300 Bedded District Hospital at Singtam (Topakhani), East Sikkim — lapsed, 2.9 km away
- Diversion of 0.1308 Ha of Forest Land for Construction of Road From Lower… — forest land use approved, 3.6 km away
- Diversion of Forest Land for the work "Construction of 132kv D/C Transmission… — in-principle approval, conditions pending, 3.9 km away
- Diversion of 280 Meters of Land Under Khasmahal Comprising of 2755sq. Ft. and… — in-principle approval, conditions pending, 4.5 km away
- Diversion of 63.73 Ha of Forest Land for Regularization (8.0 Ha — more information requested, 5 km away
More from Urban Development Department in East District
- 11 MLD Water Treatment Plant (WTP) and Approach Road at Bhusuk under Sikkim… — more information requested
- Clear Water Reservoir in Pakyong under Sikkim Integrated Urban Development… — more information requested
- Sikkim Integrated Urban Development Project — more information requested
- Diversion of 0.9833 Ha of Forest Land for Development of Solid Waste… — forest land use approved
6 Urban Development Department, Sikkim projects in East District
All 8 Urban Development Department, Sikkim projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.