Quick answers
What is this project?
Diversion of 0.1308 Ha of Forest Land for Construction of Road From Lower Sumin to Sangay Tar Under Rangpoo T Range, Pakyong Division by R&b Deptt, Gos is an approved road project in Pakyong Forest Block, Pakyong, East District, Sikkim. The site covers 1 acre.
Who is building it?
The applicant is Public Works Department.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 15 Apr 2026), as of 27 Nov 2026.
Where is it?
In Pakyong Forest Block, Pakyong, East District, Sikkim.
How big is it?
It has a stated cost of ₹1.2 crore; a site of 1 acre and 1,310 m² of forest land.
When was it filed?
The application was filed on 18 Sept 2023.
Project details
| Status | Forest land use approved |
|---|---|
| Status since | 15 Apr 2026 |
| Application filed | 18 Sept 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Public Works Department |
| Land area | 1 acres (0.4 ha) |
| Forest land | 1,310 m² |
| Project cost | ₹1.2 crore |
| Village / locality | Pakyong Forest Block |
| Taluk / tehsil | Pakyong |
| District | East District |
| State | Sikkim |
| Location from | Site boundary on record |
| Our reference | WID-SK-00174 |
In context
22 applications in East District since January 2022 are in the same category (Roads & highways): 1 approved, 13 filed or under review, and 6 withdrawn, lapsed or rejected. At 1 acre, this one is smaller than 53% of them.
6 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Pakyong Forest Block, Pakyong, East District, Sikkim. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- 300 Bedded District Hospital at Singtam (Topakhani), East Sikkim — lapsed, 650 m away
- Widening of Existing Carriageway Into 2 Lanes With Paved Shoulder… — more information requested, 2.6 km away
- Sewerage Treatment Plant at Golitar Singtam East Sikkim — more information requested, 3.5 km away
- Rehabilitation of Sewerage System of Singtam Town — more information requested, 3.6 km away
- Sikkim Integrated Urban Development Project — more information requested, 3.6 km away
- Diversion of 2.64 Ha of Forest Land for Const of Road Form Bojey Tar to Upper… — in-principle approval, conditions pending, 4.1 km away
- 40m Span Steel Bridge Over Rani Khola and 25m Span Steel Bridge Over Hel Khola… — more information requested, 5.2 km away
- 40m Span Steel Bridge Over Rani Khola and 25m Span Steel Bridge Over Hel Khola… — more information requested, 5.3 km away
More from Public Works Department in East District
- Diversion of 0.02 Ha of Forest Land for the Construction of 62mtr Span Steel… — initial checks
- Diversion of 0.3192 ha of forest land for construction of Single lane Link… — lapsed
- Diversion of 0.7755 Ha of Forest Land for the Construction of Link Road From… — more information requested
- Diversion of 0.0183 Ha of Forest Land for Const of Sewerage System for Zone… — forest land use approved
- Diversion of 2.64 Ha of Forest Land for Const of Road Form Bojey Tar to Upper… — in-principle approval, conditions pending
6 Public Works Department, Sikkim projects in East District
All 21 Public Works Department, Sikkim projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.