Quick answers
What is this project?
Diversion of 2.64 Ha of Forest Land for Const of Road Form Bojey Tar to Upper Sumin Km 0 to 4 is a proposed road project in Kartok, Pakyong, East District, Sikkim. The site covers 7.8 acres.
Who is building it?
The applicant is Public Works Department.
Has it been approved?
Not yet. The application is still under review: its status is “In-principle approval, conditions pending”, as of 27 Nov 2026.
Where is it?
In Kartok, Pakyong, East District, Sikkim.
How big is it?
It has a stated cost of ₹5.2 crore; a site of 7.8 acres and 6.5 acres (2.6 ha) of forest land.
When was it filed?
The application was filed on 10 Apr 2023.
Project details
| Official title | Diversion of 2.64 Ha of Forest Land for Const of Road Form Bojey Tar to Upper Sumin Km 0 to 4 in Pakyong District, Sikkim by R&b, Deptt, Gos |
|---|---|
| Status | In-principle approval, conditions pending |
| Status since | 8 Oct 2026 |
| Application filed | 10 Apr 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Public Works Department |
| Land area | 7.8 acres (3.2 ha) |
| Forest land | 6.5 acres (2.6 ha) |
| Project cost | ₹5.2 crore |
| Village / locality | Kartok |
| Taluk / tehsil | Pakyong |
| District | East District |
| State | Sikkim |
| Location from | Site boundary on record |
| Our reference | WID-SK-00230 |
In context
22 applications in East District since January 2022 are in the same category (Roads & highways): 1 approved, 13 filed or under review, and 6 withdrawn, lapsed or rejected. At 7.8 acres, this one is larger than 68% of them.
15 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kartok, Pakyong, East District, Sikkim. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of 0.96 Ha of Forest Land for Construction of Play Ground With Basic… — lapsed, 1.3 km away
- 40m Span Steel Bridge Over Rani Khola and 25m Span Steel Bridge Over Hel Khola… — more information requested, 2.5 km away
- 40m Span Steel Bridge Over Rani Khola and 25m Span Steel Bridge Over Hel Khola… — more information requested, 2.8 km away
- 40m Span Steel Bridge Over Rani Khola and 25m Span Steel Bridge Over Hel Khola… — lapsed, 2.8 km away
- Diversion of forest land for construction of Christian Burial land at Namli… — not approved, 3.4 km away
- Diversion of Forest Land 0.20 Hac for Construction of Office Complex for… — more information requested, 3.7 km away
- Diversion of forest land of 0.0814 Ha for construction of 11KV HT line at… — more information requested, 3.8 km away
- Diversion of 0.1308 Ha of Forest Land for Construction of Road From Lower… — forest land use approved, 4.1 km away
More from Public Works Department in East District
- Diversion of 0.02 Ha of Forest Land for the Construction of 62mtr Span Steel… — initial checks
- Diversion of 0.3192 ha of forest land for construction of Single lane Link… — lapsed
- Diversion of 0.7755 Ha of Forest Land for the Construction of Link Road From… — more information requested
- Diversion of 0.1308 Ha of Forest Land for Construction of Road From Lower… — forest land use approved
- Diversion of 0.0183 Ha of Forest Land for Const of Sewerage System for Zone… — forest land use approved
6 Public Works Department, Sikkim projects in East District
All 21 Public Works Department, Sikkim projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.