What is Sikkim Integrated Urban Development Project?
Sikkim Integrated Urban Development Project is a proposed project in Taza, Pakyong, East District, Sikkim. The site covers 0.8 acres.
Who is building it?
The applicant is Urban Development Department.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Taza, Pakyong, East District, Sikkim.
How big is it?
It has a stated cost of ₹35.1 crore; a site of 0.8 acres and 3,300 m² of forest land.
When was it filed?
The application was filed on 2 Aug 2025.
Project details
| Status | More information requested |
|---|---|
| Status since | 7 Aug 2026 |
| Application filed | 2 Aug 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Other |
| Applicant | Urban Development Department |
| Land area | 3,300 m² |
| Forest land | 3,300 m² |
| Project cost | ₹35.1 crore |
| Village / locality | Taza |
| Taluk / tehsil | Pakyong |
| District | East District |
| State | Sikkim |
| Location from | Site boundary on record |
| Our reference | WID-SK-00158 |
In context
34 applications in East District since January 2022 are in the same category (Other): 1 approved, 13 filed or under review, and 5 withdrawn, lapsed or rejected. At 0.8 acres, this one is smaller than 74% of them.
16 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Taza, Pakyong, East District, Sikkim. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Clear Water Reservoir in Pakyong under Sikkim Integrated Urban Development… — more information requested, 700 m away
- Diversion of Forest Land 0.20 Hac for Construction of Office Complex for… — more information requested, 900 m away
- Laying of Proposed Siliguri - Gangtok Pipeline of 12" Dia Carbon steel — lapsed, 1.9 km away
- Laying of Proposed Siliguri - Gangtok Pipeline of 12" Dia Carbon steel — lapsed, 1.9 km away
- Diversion of 0.96 Ha of Forest Land for Construction of Play Ground With Basic… — lapsed, 3.4 km away
- Laying of Proposed 18 Ø (Carbon steel) Natural Gas Pipeline — lapsed, 3.6 km away
- Diversion of 0.02 Ha of Forest Land for the Construction of 62mtr Span Steel… — initial checks, 3.9 km away
- Diversion of forest land for construction of Christian Burial land at Namli… — not approved, 4.4 km away
More from Urban Development Department in East District
- 11 MLD Water Treatment Plant (WTP) and Approach Road at Bhusuk under Sikkim… — more information requested
- Clear Water Reservoir in Pakyong under Sikkim Integrated Urban Development… — more information requested
- Sikkim Integrated Urban Development Project — lapsed
- Sikkim Integrated Urban Development Project — more information requested
- Diversion of 0.9833 Ha of Forest Land for Development of Solid Waste… — forest land use approved
6 Urban Development Department, Sikkim projects in East District
All 8 Urban Development Department, Sikkim projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.