Quick answers
What is this project?
Laying of Proposed Siliguri - Gangtok Pipeline of 12" Dia Carbon steel is a lapsed pipeline project in Pakyong Forest Block, Pakyong, East District, Sikkim. It seeks 0.9 acres of forest land.
Who is building it?
The applicant is Indradhanush Gas Grid Limited.
Has it been approved?
No. The application was lapsed on 10 May 2024, so it is no longer under consideration.
Where is it?
In Pakyong Forest Block, Pakyong, East District, Sikkim.
How big is it?
It has a stated cost of ₹172.3 crore and 3,460 m² of forest land.
When was it filed?
The application was filed on 15 Nov 2023.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Laying of Proposed Siliguri - Gangtok Pipeline of 12" Dia Carbon steel
Project details
| Official title | Laying of Proposed Siliguri - Gangtok Pipeline of 12" Dia Carbon steel Along with OFC Conduit in the Pakyong District, Sikkim. |
|---|---|
| Status | Lapsed |
| Status since | 10 May 2024 |
| Application filed | 15 Nov 2023 |
| Approval sought | Forest land use |
| Application type | Change of use |
| Sector | Pipelines |
| Applicant | Indradhanush Gas Grid Limited |
| Forest land | 3,460 m² |
| Project cost | ₹172.3 crore |
| Village / locality | Pakyong Forest Block |
| Taluk / tehsil | Pakyong |
| District | East District |
| State | Sikkim |
| Location from | Site boundary on record |
| Our reference | WID-SK-00233 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Change of use filed 15 Nov 2023 (this page) | Lapsed | ₹172.3 crore | |
| New project filed 15 Nov 2023 | Lapsed | ₹172.3 crore |
In context
7 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Pakyong Forest Block, Pakyong, East District, Sikkim. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Laying of Proposed Siliguri - Gangtok Pipeline of 12" Dia Carbon steel — lapsed, 0 m away
- Diversion of Forest Land 0.20 Hac for Construction of Office Complex for… — more information requested, 1.6 km away
- Sikkim Integrated Urban Development Project — more information requested, 1.9 km away
- Laying of Proposed 18 Ø (Carbon steel) Natural Gas Pipeline — lapsed, 2 km away
- Clear Water Reservoir in Pakyong under Sikkim Integrated Urban Development… — more information requested, 2.4 km away
- Diversion of 0.96 Ha of Forest Land for Construction of Play Ground With Basic… — lapsed, 3.1 km away
- Diversion of 0.3192 ha of forest land for construction of Single lane Link… — lapsed, 3.8 km away
- Diversion of 2.64 Ha of Forest Land for Const of Road Form Bojey Tar to Upper… — in-principle approval, conditions pending, 4.3 km away
More from Indradhanush Gas Grid Limited in East District
3 Indradhanush Gas Grid projects in East District
All 39 Indradhanush Gas Grid projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.