LapsedPower · East District, Sikkim

Diversion of 10.1 Ha of forest land for Setting up of 5 MW grid connected Solar Photovoltaic Power Plant near Hangu Lake, Gangtok, Sikkim by M/s REACH

Diversion of 10.1 Ha of forest land for Setting up of 5 MW grid connected Solar Photovoltaic Power Plant near Hangu Lake, Gangtok, Sikkim by M/s REACH is a lapsed power project in Kyongnosla Forest Block, Gangtok, East District, Sikkim. The site covers 25 acres. Its stated project cost is ₹25 crore. As of 27 Nov 2026, its status is “Lapsed” (since 22 Aug 2026).

See it on the live map All projects in East District

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Diversion of 10.1 Ha of forest land for Setting up of 5 MW grid connected Solar Photovoltaic Power Plant near Hangu Lake, Gangtok, Sikkim by M/s REACH is a lapsed power project in Kyongnosla Forest Block, Gangtok, East District, Sikkim. The site covers 25 acres.

Who is building it?

The applicant is Abhinay Bhandari.

Has it been approved?

No. The application was lapsed on 22 Aug 2026, so it is no longer under consideration.

Where is it?

In Kyongnosla Forest Block, Gangtok, East District, Sikkim.

How big is it?

It has a stated cost of ₹25 crore; a site of 25 acres and 25 acres (10.1 ha) of forest land.

When was it filed?

The application was filed on 22 May 2026.

One of 3 filings for this project. The project's main page, with every filing and where each stands: Diversion of 10.1 Ha of forest land for Setting up of 5 MW grid connected Solar…

Project details

StatusLapsed
Status since22 Aug 2026
Application filed22 May 2026
Approval soughtForest land use
Application typeOwnership transfer
SectorPower
ApplicantAbhinay Bhandari
Land area25 acres (10.1 ha)
Forest land25 acres (10.1 ha)
Project cost₹25 crore
Village / localityKyongnosla Forest Block
Taluk / tehsilGangtok
DistrictEast District
StateSikkim
Location fromSite boundary on record
Our referenceWID-SK-00168

All filings for this project

This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Ownership transfer filed 18 Sept 2026Under forest review25 acres₹25 crore
Ownership transfer filed 22 May 2026 (this page)Lapsed25 acres₹25 crore
New project filed 28 Feb 2023Forest land use approved25 acres₹25 crore

In context

12 applications in East District since January 2022 are in the same category (Power): 1 approved, 7 filed or under review, and 1 withdrawn, lapsed or rejected. At 25 acres, this one is smaller than 58% of them.

13 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Kyongnosla Forest Block, Gangtok, East District, Sikkim. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.