What is this project?
Diversion of 10.1 Ha of forest land for Setting up of 5 MW grid connected Solar Photovoltaic Power Plant near Hangu Lake, Gangtok, Sikkim by M/s REACH is a lapsed power project in Kyongnosla Forest Block, Gangtok, East District, Sikkim. The site covers 25 acres.
Who is building it?
The applicant is Abhinay Bhandari.
Has it been approved?
No. The application was lapsed on 22 Aug 2026, so it is no longer under consideration.
Where is it?
In Kyongnosla Forest Block, Gangtok, East District, Sikkim.
How big is it?
It has a stated cost of ₹25 crore; a site of 25 acres and 25 acres (10.1 ha) of forest land.
When was it filed?
The application was filed on 22 May 2026.
One of 3 filings for this project. The project's main page, with every filing and where each stands: Diversion of 10.1 Ha of forest land for Setting up of 5 MW grid connected Solar…
Project details
| Status | Lapsed |
|---|---|
| Status since | 22 Aug 2026 |
| Application filed | 22 May 2026 |
| Approval sought | Forest land use |
| Application type | Ownership transfer |
| Sector | Power |
| Applicant | Abhinay Bhandari |
| Land area | 25 acres (10.1 ha) |
| Forest land | 25 acres (10.1 ha) |
| Project cost | ₹25 crore |
| Village / locality | Kyongnosla Forest Block |
| Taluk / tehsil | Gangtok |
| District | East District |
| State | Sikkim |
| Location from | Site boundary on record |
| Our reference | WID-SK-00168 |
All filings for this project
This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Ownership transfer filed 18 Sept 2026 | Under forest review | 25 acres | ₹25 crore |
| Ownership transfer filed 22 May 2026 (this page) | Lapsed | 25 acres | ₹25 crore |
| New project filed 28 Feb 2023 | Forest land use approved | 25 acres | ₹25 crore |
In context
12 applications in East District since January 2022 are in the same category (Power): 1 approved, 7 filed or under review, and 1 withdrawn, lapsed or rejected. At 25 acres, this one is smaller than 58% of them.
13 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kyongnosla Forest Block, Gangtok, East District, Sikkim. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of 10.1 Ha of forest land for Setting up of 5 MW grid connected… — under forest review, 0 m away
- Diversion of 10.1 Ha of forest land for Setting up of 5 MW grid connected… — forest land use approved, 0 m away
- 5 MW grid connected Solar Photovoltaic Power Plant near Hangu Lake (Phadamchen… — lapsed, 0 m away
- Job No : 2789/25-26 (S & C) : Cavern — under wildlife review, 2 km away
- Diversion of forest land of 2.38 ha for construction of Rainbow Trout Brood… — more information requested, 2 km away
- Nature Interpretation Centre at Nathula by Tourism & Civil Aviation… — more information requested, 2.1 km away
- Tourist Infrastructure at Latui RF, Nathula, Kyongnosla T Range under Gangtok… — not approved, 2.1 km away
- Diversion of Forest Land of 1.00 Ha from Sesa Mor to Tiger Hill for… — application filed, 2.2 km away
More from Abhinay Bhandari in East District
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.