Quick answers
What is this project?
Diversion of Forest Land of 1.00 Ha from Sesa Mor to Tiger Hill for construction/improvement of operational track inside Pangolakha Wild Life Sanctuary is a proposed project in Gnathang Forest Block, Gangtok, East District, Sikkim.
Who is building it?
The applicant is Ministry of Defence.
Has it been approved?
Not yet. The application is still under review: its status is “Application filed”, as of 27 Nov 2026.
Where is it?
In Gnathang Forest Block, Gangtok, East District, Sikkim.
How big is it?
It has a stated cost of ₹18 lakh.
When was it filed?
The application was filed on 8 Feb 2023.
Project details
| Status | Application filed |
|---|---|
| Status since | 8 Feb 2023 |
| Application filed | 8 Feb 2023 |
| Approval sought | Wildlife review |
| Application type | New project |
| Sector | Other |
| Applicant | Ministry of Defence |
| Project cost | ₹18 lakh |
| Village / locality | Gnathang Forest Block |
| Taluk / tehsil | Gangtok |
| District | East District |
| State | Sikkim |
| Location from | Site boundary on record |
| Our reference | WID-SK-00247 |
In context
34 applications in East District since January 2022 are in the same category (Other): 1 approved, 13 filed or under review, and 5 withdrawn, lapsed or rejected.
16 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Gnathang Forest Block, Gangtok, East District, Sikkim. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Job No : 2789/25-26 (S & C) : Cavern — under wildlife review, 650 m away
- Modern Yak Milk Processing and Value Addition Unit for Production and… — under forest review, 1.4 km away
- Diversion of Forest Land of 0.961Ha from Saragarhi(Asha Post) to Jelep Cho… — decision issued, 1.4 km away
- Construction /Improvement of Op Tr Chor II - Saragrahi From Its Existing… — decision issued, 1.7 km away
- Construction /Improvement of Op Tr Chor II - Sherathang From Its Existing… — under wildlife review, 1.7 km away
- Diversion of 1.6 Ha Forest Land at Arjun Fwd -Jelep Cho to Sangae Pp (Sangae… — decision issued, 1.8 km away
- Diversion of 10.1 Ha of forest land for Setting up of 5 MW grid connected… — under forest review, 2.2 km away
- Diversion of 10.1 Ha of forest land for Setting up of 5 MW grid connected… — lapsed, 2.2 km away
More from Ministry of Defence in East District
- Construction of Cavern by 3/11 Gr at General Area of Rajgarh — initial checks
- Under Ground Signal Centre at Kupup — decision issued
- Ascon Ph IV MW Site Pt 3777 — decision issued
- Ascon Ph IV MW Site Pt 3777 — more information requested
- Diversion of 191.621 Acres Forest Land Between Milestone-4 to Milestone-13 — lapsed
- Diversion of 1.6 Ha Forest Land at Arjun Fwd -Jelep Cho to Sangae Pp (Sangae… — decision issued
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.