Quick answers
What is this project?
5 MW grid connected Solar Photovoltaic Power Plant near Hangu Lake (Phadamchen Reserve Forest) Pakyong District is a lapsed road project in Gnathang Forest Block, Gangtok, East District, Sikkim. The site covers 25 acres.
Who is building it?
The applicant is Abhinay Bhandari.
Has it been approved?
No. The application was lapsed on 26 Nov 2024, so it is no longer under consideration.
Where is it?
In Gnathang Forest Block, Gangtok, East District, Sikkim.
How big is it?
It has a stated cost of ₹25 crore; a site of 25 acres and 25 acres (10.1 ha) of forest land.
When was it filed?
The application was filed on 16 Dec 2022.
Project details
| Official title | Setting up of 5 MW grid connected Solar Photovoltaic Power Plant near Hangu Lake (Phadamchen Reserve Forest) Pakyong District |
|---|---|
| Status | Lapsed |
| Status since | 26 Nov 2024 |
| Application filed | 16 Dec 2022 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Abhinay Bhandari |
| Land area | 25 acres (10.1 ha) |
| Forest land | 25 acres (10.1 ha) |
| Project cost | ₹25 crore |
| Village / locality | Gnathang Forest Block |
| Taluk / tehsil | Gangtok |
| District | East District |
| State | Sikkim |
| Location from | Site boundary on record |
| Our reference | WID-SK-00185 |
In context
22 applications in East District since January 2022 are in the same category (Roads & highways): 1 approved, 13 filed or under review, and 6 withdrawn, lapsed or rejected. At 25 acres, this one is larger than 79% of them.
15 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Gnathang Forest Block, Gangtok, East District, Sikkim. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of 10.1 Ha of forest land for Setting up of 5 MW grid connected… — under forest review, 0 m away
- Diversion of 10.1 Ha of forest land for Setting up of 5 MW grid connected… — lapsed, 0 m away
- Diversion of 10.1 Ha of forest land for Setting up of 5 MW grid connected… — forest land use approved, 0 m away
- Job No : 2789/25-26 (S & C) : Cavern — under wildlife review, 2 km away
- Diversion of forest land of 2.38 ha for construction of Rainbow Trout Brood… — more information requested, 2 km away
- Nature Interpretation Centre at Nathula by Tourism & Civil Aviation… — more information requested, 2.1 km away
- Tourist Infrastructure at Latui RF, Nathula, Kyongnosla T Range under Gangtok… — not approved, 2.1 km away
- Diversion of Forest Land of 1.00 Ha from Sesa Mor to Tiger Hill for… — application filed, 2.2 km away
More from Abhinay Bhandari in East District
- Diversion of 10.1 Ha of forest land for Setting up of 5 MW grid connected… — under forest review
- Diversion of 10.1 Ha of forest land for Setting up of 5 MW grid connected… — lapsed
- Diversion of 10.1 Ha of forest land for Setting up of 5 MW grid connected… — forest land use approved
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.