Quick answers
What is Job No : 2789/25-26 (S & C) : Cavern?
Job No : 2789/25-26 (S & C) : Cavern is a proposed project in Gangtok Forest Block, Gangtok, East District, Sikkim. The site covers 0.1 acres.
Who is building it?
The applicant is Suraj Singh.
Has it been approved?
Not yet. The application is still under review: its status is “Under wildlife review”, as of 27 Nov 2026.
Where is it?
In Gangtok Forest Block, Gangtok, East District, Sikkim.
How big is it?
It has a stated cost of ₹7.4 crore and a site of 0.1 acres.
When was it filed?
The application was filed on 17 Dec 2025.
Project details
| Status | Under wildlife review |
|---|---|
| Status since | 17 Dec 2025 |
| Application filed | 17 Dec 2025 |
| Approval sought | Wildlife review |
| Application type | New project |
| Sector | Other |
| Applicant | Suraj Singh |
| Land area | 500 m² |
| Project cost | ₹7.4 crore |
| Village / locality | Gangtok Forest Block |
| Taluk / tehsil | Gangtok |
| District | East District |
| State | Sikkim |
| Location from | Site boundary on record |
| Our reference | WID-SK-00276 |
In context
34 applications in East District since January 2022 are in the same category (Other): 1 approved, 13 filed or under review, and 5 withdrawn, lapsed or rejected. At 0.1 acres, this one is smaller than 90% of them.
16 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Gangtok Forest Block, Gangtok, East District, Sikkim. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of Forest Land of 1.00 Ha from Sesa Mor to Tiger Hill for… — application filed, 650 m away
- Modern Yak Milk Processing and Value Addition Unit for Production and… — under forest review, 750 m away
- Diversion of forest land of 2.38 ha for construction of Rainbow Trout Brood… — more information requested, 1.8 km away
- Diversion of 10.1 Ha of forest land for Setting up of 5 MW grid connected… — under forest review, 2 km away
- Diversion of 10.1 Ha of forest land for Setting up of 5 MW grid connected… — lapsed, 2 km away
- Diversion of 10.1 Ha of forest land for Setting up of 5 MW grid connected… — forest land use approved, 2 km away
- 5 MW grid connected Solar Photovoltaic Power Plant near Hangu Lake (Phadamchen… — lapsed, 2 km away
- Diversion of Forest Land of 0.961Ha from Saragarhi(Asha Post) to Jelep Cho… — decision issued, 2 km away