Project details
| Official title | Name Change in the Terms of Reference from M/s. Krishna Godavari Power Utilities Limited to M/s. Krishna Power Utilities Limited for Integrated Ferro Alloy & Steel complex including coal based captive power plant (2X65 MW) at Village Irikigudem, Mandal Dhamarcharla, District Nalgonda, Telangana. |
|---|---|
| Status | Cleared for impact study |
| Status since | 22 Jan 2024 |
| Application filed | 29 Dec 2023 |
| Approval sought | Environmental approval |
| Application type | Ownership transfer |
| Sector | Industry |
| Applicant | Krishna Power Utilities Limited |
| Land area | 171.1 acres (69.2 ha) |
| Project cost | ₹720 crore |
| Village / locality | Irkigudem |
| Taluk / tehsil | Dameracherla |
| District | Nalgonda |
| State | Telangana |
| Location from | Site boundary on record |
| Our reference | WID-TG-00561 |
In context
23 applications in Nalgonda since January 2022 are in the same category (Industry): 16 approved, 5 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 44 days from filing to approval. At 171.1 acres, this one is larger than 83% of them.
3 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Irkigudem, Dameracherla, Nalgonda, Telangana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Integrated Ferro Alloy & Steel complex including 2 x 65 MW captive… — returned to applicant, 0 m away
- Proposed Integrated Ferro Alloy & Steel complex including 2 x 65 MW captive… — environmental approval granted, 0 m away
- Industrial project by M/s. THE INDIA CEMENTS LTD — initial checks, 2 km away
- Proposed Railway Doubling Project From Motumari to Vishnupuram of South… — in-principle approval, conditions pending, 5.1 km away
- Sentini Bio Spirit Water Pipeline — lapsed, 6.8 km away
- 4000 MW Yadadri Thermal Power Station (5 X 800 MW Supercritical Coal Based… — environmental approval granted, 7.2 km away
- Greenfield 1 x 200 KLPD Grain based Ethanol Plant with 1 x 4.8 MW Cogeneration… — environmental approval granted, 8.1 km away
- Proposed Mosaic Chips Quarry of Sri Gade Padma — environmental approval granted, 8.3 km away
More from Krishna Power Utilities Limited in Nalgonda
- Proposed Integrated Ferro Alloy & Steel complex including 2 x 65 MW captive… — environmental approval granted
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.