Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 11 Mar 2024 |
| Application filed | 17 Jan 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Industry |
| Applicant | Sentini Bio-Spirit Private Limited |
| Land area | 25 acres (10.1 ha) |
| Project cost | ₹230 crore |
| Village / locality | Mudimanikyam |
| Taluk / tehsil | Adavidevulapalli |
| District | Nalgonda |
| State | Telangana |
| Location from | Site boundary on record |
| Our reference | WID-TG-00353 |
In context
23 applications in Nalgonda since January 2022 are in the same category (Industry): 16 approved, 5 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 44 days from filing to approval. At 25 acres, this one is larger than 61% of them.
6 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Mudimanikyam, Adavidevulapalli, Nalgonda, Telangana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Mosaic Chips Quarry of Sri Gade Padma — environmental approval granted, 250 m away
- Proposed Mosaic Chips Quarry of Sri Gade Adinarayana Reddy — environmental approval granted, 650 m away
- Sentini Bio Spirit Water Pipeline — lapsed, 1.3 km away
- 600 KLD Grain-Based Distillery Plant producing 600 KLD Ethanol or 400 KLD… — cleared for impact study, 1.6 km away
- 4000 MW Yadadri Thermal Power Station (5 X 800 MW Supercritical Coal Based… — environmental approval granted, 2.9 km away
- Telangana State Power Generation Corporation Limited (TGGENCO) - Construction… — environmental approval granted, 3.7 km away
- Name Change in the Terms of Reference from M/s. Krishna Godavari Power… — cleared for impact study, 8.1 km away
- Proposed Integrated Ferro Alloy & Steel complex including 2 x 65 MW captive… — returned to applicant, 8.1 km away
More from Sentini Bio-Spirit Private Limited in Nalgonda
- Sentini Bio Spirit Water Pipeline — lapsed
All 6 Sentini Bio-Spirit projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.