| Status | Environmental approval granted |
|---|---|
| Status since | 15 Aug 2025 |
| Application filed | 6 Jun 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Gade Padma |
| Land area | 2.5 acres (1 ha) |
| Project cost | ₹25 lakh |
| Village / locality | Mudimanikyam |
| Taluk / tehsil | Adavidevulapalli |
| District | Nalgonda |
| State | Telangana |
| Location from | Site boundary on record |
| Our reference | WID-TG-02684 |
In context
48 applications in Nalgonda since January 2022 are in the same category (Mining): 38 approved, 2 filed or under review, and 8 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 2.5 acres, this one is smaller than 96% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 4.9 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 1 mining lease has applied within 5 km.
Where it is
Mudimanikyam, Adavidevulapalli, Nalgonda, Telangana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Greenfield 1 x 200 KLPD Grain based Ethanol Plant with 1 x 4.8 MW Cogeneration… — environmental approval granted, 250 m away
- Proposed Mosaic Chips Quarry of Sri Gade Adinarayana Reddy — environmental approval granted, 400 m away
- 600 KLD Grain-Based Distillery Plant producing 600 KLD Ethanol or 400 KLD… — cleared for impact study, 1.4 km away
- Sentini Bio Spirit Water Pipeline — lapsed, 1.5 km away
- 4000 MW Yadadri Thermal Power Station (5 X 800 MW Supercritical Coal Based… — environmental approval granted, 3.1 km away
- Telangana State Power Generation Corporation Limited (TGGENCO) - Construction… — environmental approval granted, 3.7 km away
- Name Change in the Terms of Reference from M/s. Krishna Godavari Power… — cleared for impact study, 8.3 km away
- Proposed Integrated Ferro Alloy & Steel complex including 2 x 65 MW captive… — returned to applicant, 8.3 km away
About this information