What is Developing? Open the mapMap

Environmental approval grantedPower · Nalgonda, Telangana

4000 MW Yadadri Thermal Power Station (5 X 800 MW Supercritical Coal Based Thermal Power Plant) by Telangana State Power Generation Corporation Limited (TSGENCO)

4000 MW Yadadri Thermal Power Station (5 X 800 MW Supercritical Coal Based Thermal Power Plant) by Telangana State Power Generation Corporation Limited (TSGENCO) is an approved power project in Kotha Palle, Dameracherla, Nalgonda, Telangana. The site covers 2,799.7 acres. Its stated project cost is ₹34,543 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 7 May 2024).

See it on the live map All projects in Nalgonda

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

StatusEnvironmental approval granted
Status since7 May 2024
Application filed27 Mar 2024
Approval soughtEnvironmental approval
Application typeAmendment
SectorPower
ApplicantTelangana State Power Generation Corporation Limited
Land area2,799.7 acres (1,133 ha)
Project cost₹34,543 crore
Village / localityKotha Palle
Taluk / tehsilDameracherla
DistrictNalgonda
StateTelangana
Location fromSite boundary on record
Our referenceWID-TG-01336

In context

6 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Kotha Palle, Dameracherla, Nalgonda, Telangana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Telangana State Power Generation Corporation Limited in Nalgonda

All 3 Telangana State Power Generation Corporation projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.