What is Developing? Open the mapMap

LapsedPower · Thiruvallur, Tamil Nadu

1x 800 MW NCTPP Stage III by M/s. TNPGCL (Erstwhile TANGEDCO)

1x 800 MW NCTPP Stage III by M/s. TNPGCL (Erstwhile TANGEDCO) is a lapsed power project in Ennur, Ponneri, Thiruvallur, Tamil Nadu. The site covers 190 acres. Its stated project cost is ₹78 crore. As of 27 Nov 2026, its status is “Lapsed” (since 3 Apr 2026).

See it on the live map All projects in Thiruvallur

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

StatusLapsed
Status since3 Apr 2026
Application filed4 Mar 2026
Approval soughtEnvironmental approval
Application typeOwnership transfer
SectorPower
ApplicantTamil Nadu Power Generation Corporation Limited
Land area190 acres (76.9 ha)
Project cost₹78 crore
Village / localityEnnur
Taluk / tehsilPonneri
DistrictThiruvallur
StateTamil Nadu
Location fromSite boundary on record
Our referenceWID-TN-05423

In context

14 applications in Thiruvallur since January 2022 are in the same category (Power): 3 approved, 6 filed or under review, and 5 withdrawn, lapsed or rejected. At 190 acres, this one is smaller than 58% of them.

24 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Ennur, Ponneri, Thiruvallur, Tamil Nadu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Close to Kattupalli Port Expansion: A ₹2,566-Crore Upgrade for Thiruvallur, Tamil Nadu (8.4 km away).

Other projects nearby

More from Tamil Nadu Power Generation Corporation Limited in Thiruvallur

11 Tamil Nadu Power Generation Corporation projects in Chennai
All 17 Tamil Nadu Power Generation Corporation projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.