Quick answers
What is this project?
Expansion of 2x660MW Super Critical Lignite based Thermal Power Project by NLC India Ltd is a proposed power project in Kunankurichchi, Virudhachalam, Cuddalore, Tamil Nadu. The site covers 607.3 acres.
Who is building it?
The applicant is Nlc India Limited.
Has it been approved?
Not yet. The application is still under review: its status is “Returned to applicant”, as of 27 Nov 2026.
Where is it?
In Kunankurichchi, Virudhachalam, Cuddalore, Tamil Nadu.
How big is it?
It has a stated cost of ₹10,575.5 crore and a site of 607.3 acres.
When was it filed?
The application was filed on 7 Jun 2025.
Project details
| Status | Returned to applicant |
|---|---|
| Status since | 16 Jul 2025 |
| Application filed | 7 Jun 2025 |
| Approval sought | Environmental approval |
| Application type | Amendment |
| Sector | Power |
| Applicant | Nlc India Limited |
| Land area | 607.3 acres (245.8 ha) |
| Project cost | ₹10,575.5 crore |
| Village / locality | Kunankurichchi |
| Taluk / tehsil | Virudhachalam |
| District | Cuddalore |
| State | Tamil Nadu |
| Location from | Site boundary on record |
| Our reference | WID-TN-01854 |
Where it is
Kunankurichchi, Virudhachalam, Cuddalore, Tamil Nadu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Laying of OFC through TNEB poles (Existing-26 no's), in the Reserve Forest of… — more information requested, 5.1 km away
- Neyveli New Thermal Power Station (2x500 MW) — environmental approval granted, 6 km away
- Application for Change of Name in Environmental Clearance — more information requested, 6.4 km away
- Application for No Increase in Pollution Load — initial checks, 6.4 km away
- Application for No Increase in Pollution Load — initial checks, 6.4 km away
- Laying of Aerial OFC along the Reserve Forests of Cuddalore District — lapsed, 7.5 km away
- Laying of Aerial OFC along the Reserve Forests of Cuddalore District — lapsed, 7.5 km away
- M. Ramakrishnan, Gravel and Pebbles Quarry Project — environmental approval granted, 11.5 km away
More from Nlc India Limited in Cuddalore
- Neyveli New Thermal Power Station (2x500 MW) — environmental approval granted
All 14 Nlc India projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.